Thank you for liking
You have already liked this page, you can only like it once!
The central core of ESA’s new generation Ariane 6 launch vehicle arrived by boat in French Guiana from Europe on 17 January 2022. This enables combined tests at Europe’s Spaceport where Ariane 6 parts will come together on the launch pad for the first time.
Ariane 6’s central core comprises a lower stage and upper stage. The lower stage is from ArianeGroup’s Les Mureaux site in France; the upper stage is from ArianeGroup’s Bremen factory in Germany.
Upon arrival by boat at Pariacabo harbour, two containers were transported by road to the new Ariane 6 launch vehicle assembly building – part of the Ariane 6 launch complex at Europe’s Spaceport. Here, the rocket stages will be unpacked and installed on the assembly line machinery for integration, to form the Ariane 6 central core. After this, they will be used in ‘combined’ tests which will verify all the interfaces and functions between the Ariane 6 launch vehicle and ground facilities at the spaceport.
From arrival to hot-firing tests on the launch pad, operational procedures will follow as closely as possible those for any Ariane 6 launch campaign.