• → European Space Agency

      • Space for Europe
      • Space News
      • Space in Images
      • Space in Videos
    • About Us

      • Welcome to ESA
      • DG's News and Views
      • For Member State Delegations
      • Business with ESA
      • ESA Exhibitions
      • ESA Publications
      • Careers at ESA
    • Our Activities

      • Space News
      • Observing the Earth
      • Human Spaceflight
      • Launchers
      • Navigation
      • Space Science
      • Space Engineering
      • Operations
      • Technology
      • Telecommunications & Integrated Applications
    • For Public

    • For Media

    • For Educators

    • For Kids

    • ESA

    • Operations

    • Ground Systems Engineering

    • Space Debris

    • SSA

    • Background
    • About Operations
    • The Right Stuff
    • Multimedia

      • Images
      • Videos
    • SSA programme
    • Space Situational Awareness
    • Teams on ground
    • Ground Systems Engineering
    • EGOS - Ground operation system
    • Missions in space
    • Solar and planetary
    • Astronomy & fundamental physics
    • Earth observation
    • Human spaceflight
    • Technology demonstration
    • Past missions
    • ESA mission history
    • - Find a mission: A...Z
    • Mission control centres
    • ATV Control Centre (ATV-CC)
    • Columbus Control Centre (Col-CC)
    • Ground stations
    • ESTRACK tracking stations
    • ESTRACK Control Centre
    • - Find a station: A...Z
    • OPS Community
    • Advanced Mission Concepts & Technologies Office
    • HSO Exchange
    • Knowledge Management at ESA's Operations team

    ESA > Our Activities > Operations

    BepiColombo

    Artist's impression of the Mercury Composite Spacecraft during t
    Artist's impression of the Mercury Composite Spacecraft during the interplanetary cruise to Mercury.

    BepiColombo – ESA's first mission to Mercury – will be conducted in cooperation with Japan. The mission will consist of two separate spacecraft: ESA is building the Mercury Planetary Orbiter (MPO) and the Japanese space agency JAXA will contribute the Mercury Magnetospheric Orbiter (MMO).

    The mission

    Europe's space scientists have identified the mission as one of the most challenging long-term planetary projects, as Mercury's proximity to the Sun makes it difficult for a spacecraft to reach and survive in the harsh environment. Scientists are keen to go to Mercury for the valuable clues that such a mission can provide in understanding the planet itself as well as the formation of our solar system; clues which cannot be obtained with distant observations from Earth.

    The objectives of the mission are:

    • Study the origin and evolution of a planet close to its parent star
    • Study Mercury as a planet - its form, interior, structure, geology, composition and craters
    • Investigate Mercury's vestigial atmosphere (exosphere) - its composition and dynamics
    • Study Mercury's magnetised envelope (magnetosphere) - structure and dynamics
    • Investigate the origin of Mercury's magnetic field
    • Confirm Einstein's theory of general relativity

    MPO will study the surface and internal composition of the planet, while MMO will study Mercury's magnetosphere, the region of space around the planet that is dominated by its magnetic field.

    Astrium GmbH has been selected as Prime Contractor to build the European part of the space segment.

    ROLE Mercury observation and exploration
    LAUNCH DATE Jul-Aug 2014
    LAUNCHER Ariane 5
    LAUNCH MASS 4200 kg
    ORBIT MPO: polar orbit, 400×1500 km, 2.3hr period
    MMO: polar orbit, 400×12 000 km, 9.2hr period
    NOMINAL
    MISSION
    Arrival: November 2020 - nominal 1 year in Mercury orbit
    + ESA's first mission to Mercury will provide clues on how planets form and interact with the Sun +

    The Flight Control Team

    E. Montagnon, interim SOM, BepiColumbo
    Elsa Montagnon

    The MPO Flight Control Team (FCT) will operate the Mercury Planetary Orbiter from a Dedicated Control Room located at ESOC, in Germany. Elsa Montagnon was appointed as Spacecraft Operations Manager (SOM) in December 2006. Under her lead, the team is now working on mission operations definition and ground segment specification.

    The FCT will be supported in-flight by specialists from Flight Dynamics, Ground Facilities, and Mission Data Systems.

    Mission operations overview

    BepiColombo, one of the 'cornerstones' in ESA's long-term science programme, presents enormous but exciting challenges. Apart from Venus Express, all of ESA's previous interplanetary missions have been to relatively cold parts of the solar system. BepiColombo will be the Agency's first experience of sending a spacecraft so close to the Sun.

    Artist’s view of BepiColombo at Mercury

    The journey from Earth to Mercury will also be a first for the Agency.

    The Mercury Composite Spacecraft - consisting of the MPO and MMO spacecrafts, a Transfer Module (MTM) and a Sun-shield for the MMO (MOSIF)– will be launched into an interplanetary trajectory in July 2014.

    On its long way to Mercury, the spacecraft must brake against the Sun's gravity, which increases with proximity to the Sun - rather than accelerate away from it, as is the case with journeys to the outer solar system. BepiColombo will accomplish this by making clever use of the gravity of the Earth in 2015, Venus (twice in 2016) and Mercury itself (in 2017, 2018 and twice in 2019) and by using solar electric propulsion (SEP).

    This innovative combination of low-thrust space propulsion and gravity assist was earlier demonstrated by ESA's technology mission to the Moon, SMART-1.

    BepiColombo orbits

    When approaching Mercury, the MTM will be jettisoned and the remaining composite spacecraft will then use a special 'Weak Stability Boundary Capture' technique to insert itself into a polar orbit, which will be stabilised by means of conventional chemical propulsion engines. The arrival will take place in November 2020.

    Orbit insertion using the ‘Weak Stability Boundary’ method gives flexibility and is more robust against failure compared to using the more traditional "big kick" approach (using a single burn of the main engine to achieve capture).

    MMO will be released into its operational orbit, then the sun-shield and the MMO interface structure will be separated while the chemical propulsion system will bring MPO to its lower orbit.

    The mission design and deployment sequence is depicted in the animation on this page. The prime scientific mission in orbit is planned to start in February 2021, lasting one Earth year, with a possible extension of one year.

    The ground station - Cebreros - DSA 2

    The primary ground station for BepiColombo will be ESA's 35m deep space station at Cebreros, Spain, for 8 hours/day. This will be augmented by the 35m station at New Norcia, Australia, and the Malargüe, Argentina, 35m deep space antenna during critical phases. A cross-support agreement with JAXA ensures that the Japanese Usuda Deep Space Centre's 64m antenna can be also be used as back-up during critical phases and in case of problems.

    ESA's deep space antenna DSA 2 at Cebreros, Spain.

    During the cruise to Mercury, the Mercury Composite Spacecraft will be controlled by ESOC.

    After arrival at Mercury and separation of the MMO by spin-ejection, JAXA's Sagamihara Space Operation Centre, located south-west of Tokyo, will take over control of MMO via the Usuda Deep Space Centre’s 64 m-diametre antenna, located in Nagano, Japan. ESOC will retain control of the MPO until the end of the mission.

    The platform and payload

    Visible from the bottom are: the BepiColombo transfer module, the Mercury Planetary Orbit (MPO), the sun shield and the Mercury Magnetospheric Orbiter (MMO)
    The platforms

    Mercury
    Planetary
    Orbiter (MPO)

    Mercury
    Magnetospheric
    Orbiter (MMO)
    Stabilisation 3-axis stabilised 15-rpm spin-stabilised
    Orientation Nadir Spin axis at 90° to Sun
    Spacecraft Mass 1100 kg 250 kg
    Payload Mass 80 kg 40 kg
    Power 834 W 300 W
    TM band X/Ka-band X-band
    Deployment 400 × 1508 km 400 × 11 824 km
    Operational lifetime > 1 year > 1 year
    Data volume 1550 Gb/year 160 Gb/year
    Equivalent average data rate 50 kb/s 5 kb/s
    Antenna High-temperature resistant 1.0 m X/Ka-band high-gain steerable antenna 0.8 m X-band phased array high-gain antenna
    Thrusters Ion thrusters
    Other equipment high temperature resistant thermal protection, solar arrays

    The payloads

    Planetary orbiter

    cameras, spectrometers (IR, UV, X-ray, γ-ray, neutron), radiometer, laser altimeter, magnetometer, particle analyser, Ka-band transponder, accelerometer

    Magnetospheric orbiter

    magnetometer, ion spectrometer, electron energy analyser, cold and energetic plasma detectors, plasma wave analyser, and imager

    Rate this

    Views

    Share

    • Currently 3 out of 5 Stars.
    • 1
    • 2
    • 3
    • 4
    • 5
    Rating: 3/5 (1 votes cast)

    Thank you for rating!

    You have already rated this page, you can only rate it once!

    Your rating has been changed, thanks for rating!

    80
    facebook
    twitter
    reddit
    google plus
    digg
    tumbler
    digg
    blogger
    myspace
    • More information
    • BepiColombo overview
    • BepiColombo in-depth
    • BepiColombo Science Operations Center
    • Images, animations
    • Ground stations
      • Cebreros - DSA 2
      • Launch vehicle
      • Soyuz
      • Related
      • JAXA (Japan Aerospace Exploration Agency)
      • JAXA - BepiColombo mission
      • JAXA - Usuda Deep Space Center

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • Google Buzz
    • Subscribe
    • App Store
    • ESA Operations Twitter

    Follow ESA operations

    • LATEST ARTICLES
    • · CryoSat hits land
    • · Ariane 5 completes seven launches …
    • · Measuring skull pressure without t…
    • · Malargüe station inauguration
    • · The solar wind is swirly
    • FAQ

    • Jobs at ESA

    • Site Map

    • Contacts

    • Terms and conditions