• → European Space Agency

      • Space for Europe
      • Space News
      • Space in Images
      • Space in Videos
    • About Us

      • Welcome to ESA
      • DG's News and Views
      • For Member State Delegations
      • Business with ESA
      • ESA Exhibitions
      • ESA Publications
      • Careers at ESA
    • Our Activities

      • Space News
      • Observing the Earth
      • Human Spaceflight
      • Launchers
      • Navigation
      • Space Science
      • Space Engineering
      • Operations
      • Technology
      • Telecommunications & Integrated Applications
    • For Public

    • For Media

    • For Educators

    • For Kids

    • ESA

    • Operations

    • Ground Systems Engineering

    • Space Debris

    • SSA

    • Background
    • About Operations
    • The Right Stuff
    • Multimedia

      • Images
      • Videos
    • SSA programme
    • Space Situational Awareness
    • Teams on ground
    • Ground Systems Engineering
    • EGOS - Ground operation system
    • Missions in space
    • Solar and planetary
    • Astronomy & fundamental physics
    • Earth observation
    • Human spaceflight
    • Technology demonstration
    • Past missions
    • ESA mission history
    • - Find a mission: A...Z
    • Mission control centres
    • ATV Control Centre (ATV-CC)
    • Columbus Control Centre (Col-CC)
    • Ground stations
    • ESTRACK tracking stations
    • ESTRACK Control Centre
    • - Find a station: A...Z
    • OPS Community
    • Advanced Mission Concepts & Technologies Office
    • HSO Exchange
    • Knowledge Management at ESA's Operations team

    ESA > Our Activities > Operations

    CryoSat-2 operations

    CryoSat-2 satellite

    From an altitude of just over 700 km and reaching latitudes of 88°, CryoSat-2 is monitoring precise changes in the thickness of the polar ice sheets and floating sea ice. The observations made over the three-year lifetime of the mission will provide conclusive evidence of rates at which ice cover may be diminishing.

    It is now generally agreed that the Earth's atmosphere is getting warmer, and although the impact of climate change is expected to be amplified at the poles, it is extremely difficult to predict what effect this is having on the polar ice cover.

    The mission

    The go-ahead to build and launch the second CryoSat mission came in February 2006 after the loss of the first CryoSat satellite in October 2005 due to launcher failure.

    The mission's objectives remain the same as before – to measure ice thickness on both land and sea very precisely to provide conclusive proof as to whether there a trend toward diminishing polar ice cover, furthering our understanding of the relationship between ice and global climate.

    The CryoSat-2 Flight Operations Control Centre is located at ESOC, Darmstadt, Germany.

    ROLE Earth observation (EO)
    LAUNCH DATE 8 April 2010
    LAUNCHER/LOCATION Dnepr/Baikonur Cosmodrome, Kazakhstan
    LAUNCH MASS 720 kg
    ORBIT Low-Earth, non-Sun-synchronous; 717 km
    PERIOD 100 minutes
    NOMINAL
    MISSION
    3.5 years
    + CryoSat-2 data will help determine whether arctic ice masses are thinning due to global warming +

    The Flight Control Team

    N. Mardle, Cryosat SOM
    Nic Mardle

    The CryoSat Flight Control Team works in a Dedicated Control Room located at ESOC.

    Spacecraft Operations Manager Nic Mardle, from the UK, is an experienced spacecraft manager who assembled and trained the first CryoSat Flight Control Team in 2003-05.

    Everyone at ESOC watched in profound disappointment as the first CryoSat mission, launched 8 October 2005 on a Rockot launcher, ended in failure; CryoSat was totally lost just a few minutes after launch and before the ESOC Mission Control Team even had a chance to acquire the satellite.

    Although CryoSat-2 is in theory a rebuild there are plenty of challenges to keep the team busy, including over 80 changes to the satellite as well as new hardware and software available for the ground control systems and new members in the team. All the elements were revalidated and tested prior to the new launch date, so that the Flight Control Team was equally prepared as the last time to look after command and control, on-board software maintenance and mission planning, as well as interfacing with other ESOC teams, including Flight Dynamics, Ground Facilities and Software Support.

    Since launch on 8 April 2010, Mardle and her team have been working on maintaining and operating the spacecraft through the commissioning phase into the routine operations phase.

    Mission operations overview

    Liftoff of ESA's CryoSat-2

    CryoSat-2 was launched at 15:57 on 8 April 2010.

    For CryoSat-2, the LEOP (Launch and Early Orbit Phase) period was (almost) unique, as the satellite does not have any deployable solar panels; in fact the satellite has no moving parts at all, except for some valves in the propulsion system.

    This has enabled a very significant cost saving, but does pose some problems for the provision of adequate solar power in CryoSat-2's unusual orbit. The solar panels are fixed to the satellite body, forming a 'roof' at a carefully optimised angle, which provides adequate power under all orbital conditions and still fits within the launch vehicle.

    Exhaustive preparations and rehearsals took place during the pre-launch period, and mission operations proper commenced upon separation of the satellite from the launcher and will continue throughout the 3.5-year nominal lifetime of the mission. The FCT at ESOC oversees mission planning, spacecraft status monitoring, spacecraft control, orbit determination and control, attitude determination and control and on-board software maintenance, among others. These are all tasks which are common to any low-earth orbit mission such as CryoSat.

    The launch and early orbit phase, which lasted three days, brought the satellite into its Fine Pointing Mode, in preparation to start switching on the payload followed by commissioning activities. The Commissioning Phase lasted six months and consisted of verifying the performance of all elements of the system: satellite platform and payload, orbit, ground segment and science data processing facilities.

    CryoSat measuring sea ice

    The Commissioning Phase was an extremely busy period for all the teams, and included not only preforming the planned operations but also resolving any problems that occurred with the satellite and the ground segment.

    In addition, the teams supported last-minute requests from external agencies, for example underflights with NASA's Icebridge team, which allowed parallel aberrations from CryoSat and a radar flown in an aeroplane by NASA over the Antarctic and later in the year over the Arctic.

    The Commissioning Phase was successfully concluded with the Commissioning Results Review held in November 2010 and allowing the mission to formally transition into the routine phase.

    Since the completion of the Commissioning Phase, the science team have been busy analysing the data and determining the evolution of ice thickness around the globe.

    The ground station - Kiruna

    Kiruna ESTRACK station
    Kiruna station

    The single routine ground station for CryoSat is located at the ESA/ESTRACK station in Kiruna, in northern Sweden (a network of additional stations will support CryoSat-2 during LEOP - including Troll and Svalbard)). The station is linked to the Flight Operations Control Centre, at ESOC in Darmstadt, for control and monitoring of the satellite.

    In addition, all of the considerable science data processing will be done locally at Kiruna by an automated system of computer workstations.

    Ground segment & mission control system

    SCOS-2000 MCS
    This mission is using SCOS-2000

    The CryoSat-2 ground segment at ESOC is using the SCOS-2000 mission control system.

    Mission planning is preformed at ESOC while the payload is coordinated by ESA/ESRIN; the detailed plan is uploaded regularly to the satellite from Kiruna. The large amount of data received from the payload, and in particular from the altimeter, is being pre-processed at Kiruna, before being sent to ESA/ESRIN for final processing and data dissemination to the users.

    Diagram of ground segment infrastructure

    An important aspect of the CryoSat-2 Ground Segment is that it has been designed for operations with a low level of manpower.

    Furthermore, remote operations and troubleshooting can be performed on all systems located in Kiruna.

    The platform and payload

    CryoSat-2's primary payload is the SAR/Interferometric Radar Altimeter (SIRAL), which has extended capabilities to meet the measurement requirements for ice-sheet elevation and sea-ice free board.

    Inside CryoSat

    CryoSat-2 is also carrying three star trackers for measuring the orientation of the baseline. In addition, a radio receiver called Doppler Orbit and Radio Positioning Integration by Satellite (DORIS) and a small laser retroreflector ensures that CryoSat-2's position will be accurately tracked.

    Unlike most satellites, CryoSat does not have any deployable solar panels; in fact the satellite has no moving parts at all, except for some valves in the propulsion system.

    This has enabled a very significant cost saving, but does pose some problems for the provision of adequate solar power in Cryostat-2's unusual orbit. The solar panels are rigidly fixed to the satellite body, forming a "roof" with a carefully optimised angle, which provides adequate power under all orbital conditions and still fits within the launch vehicle.

    Rate this

    Views

    Share

    • Currently 0 out of 5 Stars.
    • 1
    • 2
    • 3
    • 4
    • 5
    Rating: 0/5 (0 votes cast)

    Thank you for rating!

    You have already rated this page, you can only rate it once!

    Your rating has been changed, thanks for rating!

    32
    facebook
    twitter
    reddit
    google plus
    digg
    tumbler
    digg
    blogger
    myspace
    • More information
      • CryoSat
      • CryoSat brochure (PDF)
      • Images, animations
      • Ground stations
        • Kiruna station
        • Launch vehicle
        • Dnepr User's Guide
        • Click here
          Click here
          Related video
        • Related
        • Kosmotras

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • Google Buzz
    • Subscribe
    • App Store
    • ESA Operations Twitter

    Follow ESA operations

    • LATEST ARTICLES
    • · CryoSat hits land
    • · Ariane 5 completes seven launches …
    • · Measuring skull pressure without t…
    • · Malargüe station inauguration
    • · The solar wind is swirly
    • FAQ

    • Jobs at ESA

    • Site Map

    • Contacts

    • Terms and conditions