• → European Space Agency

      • Space for Europe
      • Space News
      • Space in Images
      • Space in Videos
    • About Us

      • Welcome to ESA
      • DG's News and Views
      • For Member State Delegations
      • Business with ESA
      • ESA Exhibitions
      • ESA Publications
      • Careers at ESA
    • Our Activities

      • Space News
      • Observing the Earth
      • Human Spaceflight
      • Launchers
      • Navigation
      • Space Science
      • Space Engineering
      • Operations
      • Technology
      • Telecommunications & Integrated Applications
    • For Public

    • For Media

      • Media
      • ESA TV
      • Videos for professionals
      • Photos
    • For Educators

    • For Kids

    • ESA

    • Proba Missions

    • Proba-V at a glance
    • Overview
    • Objectives
    • About the instrument
    • V for Vegetation
    • Serving science
    • Fitting the world in a box
    • About the platform
    • Joining ESA’s Proba family
    • Boxing clever
    • About the mission
    • Made in Belgium
    • On the ground
    • Starting operations
    • New technology
    • Hitching a ride
    • Tracking aircraft from orbit
    • New space semiconductor
    • Detecting radiation
    • Fly by fibre
    • About the launch
    • Launcher
    • Launch site
    • Proba-V launch diary part 1
    • Proba-V launch diary part 2
    • Proba-V launch diary part 3
    • Proba-V launch diary part 4
    • What's next
    • Proba-3
    • Already flying
    • Proba-1
    • Proba-2
    • Multimedia
    • Proba-V images
    • Proba images
    • Proba Earth images
    • Videos
    • Animations
    • Contact
    • Contact us

    ESA > Our Activities > Technology > Proba Missions

    Proba-V's journey begins

    Proba-V launch diary part 1

    12 March 2013

    Karim Mellab, ESA's Proba-V Project Manager, shares his experiences of the launch campaign in Kourou, French Guiana:

    Day –1: Wednesday 6 March

    Departure of the satellite and associated hardware from QinetiQ Space in Kruibeke, Belgium to Brussels airport for packaging on an aircraft pallet.

    Day 0: Thursday 7 March

    In parallel with Proba-V’s initial team from QinetiQ (Davy Vrancken, Tom Debraekeleer and Bart De Wilde) travelling to Kourou, the satellite travelled from Brussels airport to Paris Orly airport by lorry. The satellite was stored in the Air France warehouse overnight.

    Proba-V on pallet ready for flying

    Day 1: Friday 8 March

    The satellite was loaded in the Air France daily passenger flight at 09:40 CET. The flight took off at 10:58 CET en route to Kourou. The satellite and its associated hardware travelled unattended. The first wave of the ESA team (Michale Francois and me) departed on the same day, aboard the Air Caraibes flight departing at 12:50 CET.

    The Air France flight landed at Kourou 9:20 hours later, at 16:15 local time.

    The Proba-V auxiliary passenger on the same Vega flight (Vietnamese Earth observation mission VNREDSat) arrived in Kourou the same day at 16:00, travelling with an Air France charter cargo.

    Offloading of Proba-V from the aircraft proved a very smooth process. The satellite container and the two batteries (flight and spare) were loaded in an air-conditioned truck. The convoy escorted by the Gendarmerie started the final trip to the Guiana Space Centre at 19:30 and arrived there at 21:15. One QinetiQ Space team member travelled with the satellite container while a second followed the convoy.

    Proba-V arriving in French Guiana

    The associated equipment (Ground Segment Equipment, GSE) was also unloaded and loaded on to a dedicated lorry that started immediately travelling to CSG. One QinetiQ team member escorted the ground equipment. All equipment was placed in secure storage inside CSG.

    The ESA team arrived at CSG at the same time as the satellite and was present for the offloading of the lorry into the airlock of the S1B EPCU (Ensemble Preparation Charge Utile) payload preparation building. An hour later the airlock was opened and the containers moved inside the cleanroom. The EPCU was then closed and secured for the night. The EPCU will be the new home of the satellite for the next three weeks.

    A very long working day that ended only at 00:30.

    Day 2: Saturday 9 March

    The day started with the daily meeting with CNES and Arianespace and the opening of the EPCU secured area. The day was dedicated to the opening of Proba-V’s associated hardware containers, preparation of the integration hall and the set-up of the satellite stand.

    At the end of the external part of the satellite container was opened in order to prepare for the satellite opening on Monday.

    Unpacked Proba-V and test equipment

    Day 3: Sunday 10 March

    A day off; so the whole of the Proba-V team on the scene so far went for a walk in the jungle. The OIP Sensor Systems team, developer of the Vegetation Instrument, arrived in French Guiana.

    Day 4: Monday 11 March

    Daily meeting for preparation of the day’s activities. The first activity was the removal of satellite from its container and the positioning on its stand.

    In parallel the OIP team prepared the Optical Ground Support Equipment needed for the alignment check of the instrument.

    The day continued with the installation and setup of all the GSE, the day finishing at 19:30.

    Rate this

    Views

    Share

    • Currently 5 out of 5 Stars.
    • 1
    • 2
    • 3
    • 4
    • 5
    Rating: 4.88/5 (9 votes cast)

    Thank you for rating!

    You have already rated this page, you can only rate it once!

    Your rating has been changed, thanks for rating!

    1118
    Tweet
    • Proba
      • Proba-V launch diary part 1
        • Proba-V launch diary part 2
          • Proba-V launch diary part 3
            • Proba-V launch diary part 4
            • Publications
            • Artist view of the Proba-V satellite
              Artist view of the Proba-V satellite
              Prova-V brochure (English)
            • Proba-V fact sheet (French)
            • Proba-V fact sheet (Dutch)
            • Proba-V fact sheet (Italian)

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • G+
    • Facebook
    • Livestream
    • Subscribe
    • App Store
    • LATEST ARTICLES
    • · Earth Explorers take centre stage …
    • · The fast winds of Venus are gettin…
    • · ExoMars 2016 set to complete const…
    • · Herschel ends operations as orbiti…
    • · Europe’s largest spaceship reache…
    • FAQ

    • Jobs at ESA

    • Site Map

    • Contacts

    • Terms and conditions