ESAATVInternational Space StationHuman Spaceflight and Exploration
   
Mission
ATV mission conceptATV flight phasesJules Verne cargoJules Verne roadmap - launch to dockingView ATV ground track
Spacecraft
ConfigurationIntegrated Cargo CarrierATV Service ModuleATV evolution
Operations
Flight operationsATV Control CentreCrew role
Industry
ESA's roleEuropean industry
Downloads
Information Kit (pdfs)ATV newspaper (pdf)ATV1 Jules Verne factsheet 2008 (pdf)
Multimedia gallery
ATV image galleryATV video galleryExhibition material
Services
Bookmark and Share
 
 
 
 
News
 
printer friendly page
Artist's impression of ESA's ATV
Jules Verne ATV has reached parking orbit 10 days after launch from Kourou
Jules Verne reaches 'parking' orbit
 
19 March 2008
Jules Verne ATV has today reached a parking position 2000 km ahead of the International Space Station. Europe's ISS re-supply spacecraft will wait at this holding point for the completion of the STS-123 Space Shuttle mission before proceeding with the first of two rendezvous demonstration days.
 
Two boosts late last night took the Automated Transfer Vehicle (ATV) to its parking orbit at the same orbital altitude as the International Space Station (ISS). In the course of this manoeuvre ATV passed just 30 km underneath the Space Station.

Three smaller boosts in the course of the morning were used to adjust the spacecraft's orbit, with Jules Verne ATV finally arriving at the parking position shortly before 13:00 CET (12:00 UT) today.

ATV's second propulsion chain was used to execute today's manoeuvres and, according to Alberto Novelli, ESA's Mission Director at the ATV Control Centre in Toulouse, France, it performed perfectly. "In doing the boosts we have tested all the pressure regulators and that worked perfectly fine. So as of today we have the proof that the propulsion system as a whole, including all the redundancies, is working fine," said Novelli.  
 
ISS seen from Space Shuttle Atlantis
Jules Verne ATV is scheduled to dock with ISS on 3 April
According to the mission schedule, ESA has also submitted an official report to the ISS partners. The report gathers together all data on the performance of Jules Verne ATV during the phasing stage of the mission since the launch from Kourou, French Guiana, ten days ago.

"We will discuss the data in a meeting with the partners on 25 March. In principle that will give us the go-ahead to continue with the first rendezvous demonstration day," explained Novelli. "As of today, this report is green and a 'go' from our side on all the criteria."

Jules Verne ATV will remain in the parking orbit until 27 March. The spacecraft will then be taken to a position ready to perform the two rendezvous demonstration days set for 29 and 31 March.

Jules Verne ATV is scheduled to dock with the International Space Station on 3 April.
 
 

 


Jules Verne ATV
ATV BlogESA's ATV blog direct from ATV mission control
Related articles
Jules Verne demonstrates flawless Collision Avoidance ManoeuvreJules Verne ready to demonstrate critical manoeuvreSuccessful manoeuvres position Jules Verne ATV for crucial testsEurope launches its first resupply ship to the ISSReplay of launch and solar array opening of Jules Verne ATV
Related links
International Space StationESA Spacecraft Operations
Related ESApod
ATV: A new generation space vehicleATV: Rendezvous in spaceATV Control Centre readies for Europe's first-ever automated docking
 
 
 
   Copyright 2000 - 2010 © European Space Agency. All rights reserved.