ESAESOCSSASpacecraft OperationsGround Systems EngineeringSpace DebrisESOC History
   
OverviewESOC virtual tourMission historyFrequently asked questions
At ESOC
Mission operationsESTRACK tracking stations
Ground Systems Engineering
About Ground Systems EngineeringResearch and Technology DevelopmentEuropean software excellenceFlight DynamicsESA Navigation FacilityESA Space Debris OfficeGround Station Engineering
Activities
External servicesHSO ExchangeESA Ground Operation System (EGOS)
Multimedia
ESA Multimedia gallery
Media Centre
Press Releases
Services
PublicationsESA-sponsored ConferencesHelpPortal terms of useSubscribe
Visiting ESOC
Getting to ESOCGuided toursContact ESOC
 
 
 
Bookmark and Share
 
 
 
 
News
 
printer friendly page
Venus Express
Artist's impression of Venus Express spacecraft
Venus Express mission operations update
 
10 November 2005
At 11:30 CET, 10 November 2005, Venus Express Ground Segment Manager Manfred Warhaut reported from ESOC's Main Control Room that both the Venus Express spacecraft and ground segment continue to perform excellently.
 
The Venus Express Launch and Early Orbit (LEOP) operations continue to run very smoothly. However, the highlight of this period was the successful planning and testing of the Trajectory Correction Manoeuvre (TCM-0).

Given the slight over-performance of the Soyuz-Fregat launcher, it was decided to do the TCM-0 in direction of Earth in order to make best use of fuel. The movement (slew) of the spacecraft was enabled at 06:20 CET, started 06:43 and was completed 07:13.

Subsequently, the TCM-0 started at 07:38:52, had a manoeuvre duration of 48 seconds and a magnitude of 0.5 metres per second. Assessment of the manoeuvre afterwards based on Doppler data indicated that the manoeuvre duration was about 1 second less than commanded with negligible error in performance.

At 08:33 the spacecraft was turned back to the starting attitude. This completed the foreseen activities for this period.

The support from the ESA and NASA Deep Space Network ground stations has been very good throughout the LEOP.

 
 
Soyuz-Fregat carrying Venus Express lifts off
Summary of operations on 9 November
 
The Soyuz-Fregat rocket lifted off right on schedule at 04:33:34.454 CET, 9 November 2005, carrying with it the Venus Express spacecraft on the start of a five-month journey to Earth's sister planet Venus.
 
 
Mission time
(time from launch)
Event
1:58 minsSolid booster separation
4:14 minsFairing separation
8:48 minsThird-stage separation
9:49 minsFregat upper-stage first burn
1:22 hrsFregat upper stage second burn
1:36:30 hrsSeparation from Fregat upper stage

 
 
Ignition of Fregat
Artist's impression of ignition of Fregat
Critical LEOP first phase successful
 
Fregat and Venus Express travel as a composite unit for a period of time after separation from the main Soyuz booster.

The first Fregat burn brought Fregat and Venus Express into a coast phase, while the second Fregat burn injected the composite into the required escape trajectory.

Starsem, the launch service provider, announced from Baikonur that separation of Venus Express from the Fregat upper stage had occurred nominally 1:36:30 hours after launch.

When the ESA ground station in New Norcia, Western Australia, acquired the telemetry signal from Venus Express at 06:30:42, some two hours after launch, the spacecraft status was nominal and the automatic separation sequence was seen to be in progress; pressurisation of the propulsion system having already been completed.

Initially after launch and main booster separation, Venus Express was rotating; the initial rate reduction and first Sun acquisition phase proceeded very smoothly. This was followed by the deployment of the two solar array panels, which was completed at 06:49. Following second Sun acquisition, the automatic separation sequence was completed 7:11.

After establishing communications with Venus Express, the first telecommands were uplinked from New Norcia at 07:09:29. Initial spacecraft configuration was achieved as expected and the spacecraft entered Safe Hold Mode (SHM) at 09:44.

LEOP activities continued as planned; the first star tracker, used to navigate the spacecraft, was switched on at 8:45. The reaction wheels, which enable the craft to be fully stabilised, were switched on at 09:57 and the spacecraft was commanded into Normal Mode at 11:00.

The second star tracker was switched on at 11:07, thereafter LEOP software patches were removed/replaced and the spacecraft was fully configured for flight in Normal Mode at 12:15. This completed a very successful first phase of LEOP. The spacecraft has behaved very much as expected.
 
 

 


Looking at VenusArtist's impression of Venus Express orbiting Venus
Launch replay
Venus Express launch
Related articles
Venus Express performs flawlessly, LEOP complete"Venus Express, give me a GO/NO GO for launch..."Venus Express: ready for lift-offGreen light for Venus Express launcher fuellingVenus Express countdown activities startedVenus Express moved back to launch padVenus Express set for transport to launcher assembly buildingVenus Express mated with upper-stage
More about...
Status reportsLaunch in detailVenus Express factsheet
Related links
Starsem - the SoyuzVenus Express operationsCebreros station webcam
 
 
 
   Copyright 2000 - 2012 © European Space Agency. All rights reserved.