ESALaunch SpecialHerschelPlanckESA Science
   
About Herschel
The infrared Universe
Spacecraft and telescope
The mission
Meet the team
Multimedia
Herschel imagesHerschel videos
Follow me!
 Herschel on Twitter
 
 
 
Bookmark and Share
 
 
 
 
Article Images
Herschel weighed and fuelled
 
22 April 2009

Herschel being weighed
Download:
 HI-RES JPEG (Size: 311 kb)
Herschel being weighed before fuelling. The measurements taken will serve as the baseline from which the final spacecraft mass will be derived after fuelling. The expected mass at launch is about 3400 Kg.

Credits: ESA
 
  Herschel fuels up
 
Preparations for fuelling
Download:
 HI-RES JPEG (Size: 1437 kb)
Herschel being prepared for fuelling with hydrazine on 9 April 2009.

Credits: ESA
 
 
Fuelling Herschel
Download:
 HI-RES JPEG (Size: 221 kb)
Hershel hydrazine filling operations. Engineers are dressed in scape suits, designed to protect them from the toxic fuel.

Credits: ESA/CNES/Arianespace/Optique Video du CSG-L. Mira
 
 
Fuelling Herschel
Download:
 HI-RES JPEG (Size: 189 kb)
Herschel hydrazine filling operations. Engineers must wear scape suits, designed to protect them from the toxic fuel.

Credits: ESA/CNES/Arianespace/Optique Video du CSG-L. Mira
 
 
Integration with the Ariane 5 adapter
Download:
 HI-RES JPEG (Size: 183 kb)
Herschel being integrated with the launcher adapter on 11 April.

Credits: ESA/CNES/Arianespace/Optique Video du CSG-L.Mira
 
 
Ariane 5 adapter
Download:
 HI-RES JPEG (Size: 344 kb)
Engineers are preparing to integrate the Herschel launcher adapter with the satellite.

Credits: ESA/CNES/Arianespace/Optique Video du CSG-L. Mira
 
 
Lowering Herschel onto the Ariane 5 adapter
Download:
 HI-RES JPEG (Size: 336 kb)
Herschel being lowered onto the launcher adapter. The adapter will connect it to the Ariane 5 during launch.

Credits: ESA/CNES/Arianespace/Optique Video du CSG-L. Mira
 
 
Integration with the Ariane 5 adapter
Download:
 HI-RES JPEG (Size: 247 kb)
Herschel being integrated with the launcher adapter on 11 April.

Credits: ESA/CNES/Arianespace/Optique Video du CSG-L. Mira
 
 
Fuelling Herschel
Download:
 HI-RES JPEG (Size: 206 kb)
Herschel hydrazine filling operations. Engineers must wear scape suits, designed to protect them from the toxic fuel.

Credits: ESA/CNES/Arianespace/Optique Video du CSG-L. Mira
 
 
Fuelling Herschel
Download:
 HI-RES JPEG (Size: 217 kb)
Hydrazine filling operations on 9 March 2009. Engineers were dressed in scape suits, designed to protect them from the toxic fuel.

Credits: ESA/CNES/Arianespace/Optique Video du CSG-L. Mira
 


Herschel: ESA's giant infrared observatoryHerschel in space, close up on its mirror
Planck: looking back at the dawn of timePlanck cruises to L2
Related articles
Herschel and Planck launch postponedHerschel instruments are 'good to go'Planck gears up for the rideHerschel and Planck to lift off on 6 MayHerschel and Planck launch updateHerschel spruced up after arrival in KourouHerschel and Planck launch postponedPlanck launch campaign update
Read more
L2, the second Lagrangian PointObservations: Seeing in infrared wavelengthsWhy infrared astronomy is a hot topic
In depth
This article in depthHerschel launch campaign journalHerschel in depth
 
 
 
   Copyright 2000 - 2011 © European Space Agency. All rights reserved.