ESA's 'team of teams' at the European Space Operations Centre
Herschel SOM in Main Control Room during simulation training
ESA's 'team of teams' ready for Herschel and Planck operations
 
12 May 2009
On 14 May, a 'team of teams' will be poised and waiting at ESOC, the European Space Operations Centre, to take over control of Herschel and Planck once they separate from their launcher, Ariane 5 flight V188. Here's a brief look at who's who 'on console' at ESOC.
 
For liftoff on 14 May, the Ariane launcher with satellites on board will be under control of the experts at ESA's Spaceport at Kourou, French Guiana.

Simultaneously, the Mission Control Team in the Main Control Room (MCR) at ESOC, Darmstadt, Germany, will closely monitor launch progress, ready to take over control of the two satellites upon separation.

Over many months, more than 200 scientists and engineers responsible for operating the two missions or providing infrastructure support have been paced through an exhaustive series of simulations and training sessions - 35 in total as of last week.  
 
ESA's 'team of teams' at the European Space Operations Centre
Herschel Flight Control Team on console in MCR
Those working on the missions comprise a 'team of teams', organised into an overall Mission Control Team, which is broken down into two separate Flight Control Teams, one per satellite, plus a number of supporting teams. These include Ground Operations, Software Support, Project Support and Flight Dynamics, which in turn are supported by extended sub-teams.

Throughout ESOC, engineers are located in the MCR, the Flight Dynamics Room, the ESTRACK Control Centre and several other specialised support rooms.
 
 
Launch day: tense but calm
 
On launch day, controllers will be tense but calm, waiting for liftoff of the Ariane 5 launcher from Kourou, French Guiana. Six hours prior to the scheduled 15:12 CEST launch, ESOC will conduct its own 'network countdown', during which proper operation of the 'ground segment' - the software and systems on the ground that support mission operations - will be verified one last time.
 
 
ESA's 'team of teams' at the European Space Operations Centre
Flight Operations Director John Dodsworth, standing, in ESOC's Main Control Room
Some 55 minutes prior to launch, the Flight Operations Director will conduct the GO/NO-GO roll call over the internal voice intercom, or 'loop'. During the roll call, all supporting teams will verbally confirm their readiness to support the launch.

The roll call is a traditional practise that gives everyone a chance to report any last-minute problems; in addition, the entire Mission Control Team will have taken part in a thorough preflight briefing review to be held on 13 May, so the probability of any undetected issue suddenly appearing is very low.

At L-30 minutes, the Flight Director will report ESOC's readiness for launch via voice loop to the Launch Control Centre in Kourou. And then the waiting begins.
 
 
ESTRACK S- & X-band ground station at Perth
Perth S- and X-band ground station
After liftoff: acquisition of signal from the satellites
 
After liftoff, the satellites will be boosted into orbit and will separate from the launcher at 25:58 (min:sec) for Herschel, followed by Planck at 28:29.

Some 37 minutes after launch, ESA's ESTRACK stations at Perth and New Norcia, located on the west coast of Australia, will intently scan the sky toward the North-West to acquire the first signals from the two satellites as they rise over the horizon above Africa.
 
 
In addition to Perth and New Norcia, ESTRACK stations at Cebreros and Maspalomas, Spain, and Kourou, French Guiana, will support the missions during the Launch and Early Orbit Phase (LEOP) - the critical first steps in the satellite's lives beginning after separation from the launcher and continues for several days.
 
 
ESA's 'team of teams' at the European Space Operations Centre
Software Coordinator working on console in ESOC's Main Control Room
The Herschel and Planck launch is particularly complex, since most of the console positions will be double-staffed since they are two separate missions being operated in parallel. During LEOP many positions in ESOC's control rooms will be staffed 24 hours/day.

In addition to the teams mentioned earlier, other dedicated support teams will be on call at ESOC throughout LEOP, including engineers in the Network Control Centre and engineers responsible for IT and PC support, telecommunications, and others.
 
 
Teams in the Main Control Room (MCR)
 

  • Flight Operations Director

    The Flight Operations Director, known more informally as the 'OD' (Operations Director) on the voice loop, will sit on console at the workstation at the right-rear of the MCR. He has overall responsibility for mission operations; beside him sits the Project Support representative, a senior engineer provided by the missions' project team from ESTEC, ESA's European Space Research & Technology Centre in the Netherlands.

  • Spacecraft Operation Manager

    In the centre of the MCR sit the two Spacecraft Operation Managers ('SOM' on the voice loop), Herschel on the left and Planck on the right. These are experienced engineers who have worked for several years training the dedicated Flight Control Teams, building the ground segment, and preparing procedures and processes for controlling the satellites during all phases of their missions.

  • Flight Control Teams

    Directly in front of the SOMs, the two Flight Control Teams will sit at consoles arrayed along the largest 'arc' of workstations. These comprise three Spacecraft Operations Engineers, each dedicated to closely monitoring and controlling specific subsystems on the spacecraft, and one Spacecraft Controller, or 'spacon', who is chiefly responsible for uploading telecommands.

  • Ground Operations Manager & Software Coordinator

    At the left-rear of the MCR sits the Ground Operations Manager, known as the 'OM' (Operations Manager) on the voice loop, and the Software Coordinator. The OM coordinates all aspects of telecommanding the spacecraft and receiving data via the ground stations, while the Software Coordinator closely monitors a number of critical systems in the ground segment. In particular, the OM is responsible for coordinating the ground stations as they initially track and then acquire the first telemetry signals from the spacecraft - one of the most critical events of launch day.

  •  
     
    ESA's 'team of teams' at the European Space Operations Centre
    Engineers in ESTRACK Control Centre at ESOC
    In the ESTRACK Control Room (ECC)
     
  • ESTRACK ground station controllers

    In the ECC, engineers will work on shift around the clock to control the ground stations assigned to support the two satellites during LEOP and later phases. Stations must be properly configured to pick up signals from the satellites and transmit telecommands.

  •  
     
    ESA's 'team of teams' at the European Space Operations Centre
    Specialist working in ESOC's Flight Dynamics Room
    In the Flight Dynamics Room (FDR)
     
  • Flight Dynamics Team

    In a separate room, the combined Flight Dynamics team will determine the satellites' orbits and attitude, and provide crucial input for activities such as trajectory correction manoeuvres required to achieve the nominal orbit of the two missions.

  •  
     
     


    ESOC videoClick to watch
    Cebreros webcamESA's webcam at the ESTRACK 35m deep-space station, Cebreros
    ESOC virtual tourA virtual tour of ESOC, ESA's Space Operations Centre
    ESTRACK gallery
    ESTRACK ground stations
    More news
    Herschel and Planck flight dynamics: It really is rocket scienceHerschel and Planck launch timelineESA to launch two large observatories to look deep into space and timeHerschel and Planck to lift off on 14 May
    More information
    Dramatisation: GO/NO-GO roll call for Herschel-Planck launchESTRACK Control Centre
     
     
     
       Copyright 2000 - 2011 © European Space Agency. All rights reserved.