CDF History
Note: This Page Serves as an archive of the old articles removed from the CDF Main PageThe Concurrent Design Facility (CDF) was established at ESTEC in November 1998; on an experimental basis, under the sponsorship and initiative of the General Studies Program (GSP). The idea was to evaluate the use of Concurrent Engineering (CE) to create an integrated design environment for the assessments of future missions. The first case study was provided by the Central European Satellite for Advance Research (CESAR) mission assessment, performed from January to March 1999, which ESA had undertaken jointly with the Italian Space Agency (ASI) on behalf of the Central European Initiative (CEI). The design facility was named after the study: CesaR (Concurrent Engineering Set-up for Advanced Results).