Why is Cost Engineering important?

26 SAMH. 2004 Dáta foilsithe 7809 Amhairc

It has always been important for organisations to estimate and control their costs properly. This is especially important for an international organisation such as ESA.

Member States have the right to expect their financial contributions will be used as efficiently as possible, returning maximum value for money. In addition, Member States make decisions on their level of involvement in optional ESA programmes based on estimates of their cost. A high level of accuracy is essential to support the decision-making process. Equally important is to maintain the costs within the proposed values.

Cost Engineering delivers early awareness of costs associated with engineering decisions and risks as a project first gets underway. Cost Engineering supports the refinement of the estimates as the technical baseline gets more consolidated and the industrial teams are formed.

In addition ESA places many contracts related to technically sophisticated items requiring experimental development. Cost Engineering provides an informed assessment of a reasonable and acceptable price for the product concerned.


Naisc ghaolmhara


Naisc ghaolmhara


Fan suas chun dáta

Liostáil lenár nuachtlitir chun an nuacht is déanaí, nuashonruithe misin, agus léargas eisiach a fháil go díreach i do bhosca isteach. Bí ar an gcéad duine a bheidh ar an eolas faoinár dtionscadail agus ár ndul chun cinn atá le teacht.