• → European Space Agency

      • Space for Europe
      • Space News
      • Space in Images
      • Space in Videos
    • About Us

      • Welcome to ESA
      • DG's News and Views
      • For Member State Delegations
      • Business with ESA
      • ESA Exhibitions
      • ESA Publications
      • Careers at ESA
    • Our Activities

      • Space News
      • Observing the Earth
      • Human Spaceflight
      • Launchers
      • Navigation
      • Space Science
      • Space Engineering
      • Operations
      • Technology
      • Telecommunications & Integrated Applications
    • For Public

    • For Media

    • For Educators

    • For Kids

    • ESA

    • GOCE

    • Earth Explorers

    • Observing the Earth

    • Living Planet

    • GOCE at a glance
    • The first of a series
    • Looking into the forces that shape our planet
    • A technological achievement
    • An intimate portrait of Earth
    • Facts and figures
    • About the spacecraft

      • Satellite
      • Payload
    • About the launch

      • Launch overview
      • Launcher
      • After launch
      • GOCE data
    • Meet the team

      • Danilo Muzi, Project Manager
      • Rune Floberghagen, Mission Manager
      • Reiner Rummel, Chairman Mission Advisory Group
      • Mark Drinkwater, Mission Scientist
      • Roger Haagmans, Mission Scientist
      • Andrea Allasio, Thales Alenia Space Project Manager
      • Michael Fehringer, System Manager
      • Paolo Laberinti, Head of Verification and Testing
      • Miguel Aguirre, Technical Officer for Definition Phase
      • Daniel Lamarre, Gradiometer Engineer
      • Juan Piñeiro, Spacecraft Operations Manager
      • Stefano Capitanio, Launch Campaign Manager
      • Pascal Gilles, Head of Earth Explorer Payload Data Ground Segment
    • Multimedia
    • Image gallery
    • Videos
    • Online resources

    ESA > Our Activities > Observing the Earth > GOCE

    After launch

    Breeze separation
    Upper-stage separation

    Around 90 minutes after GOCE was launched into orbit about 280 km above Earth, it was released by the launch vehicle’s upper stage.

    The satellite’s orbit will then decay over a period of 45 days to an operational altitude of about 260 km. During this time, GOCE will be commissioned and the electrical propulsion system checked for reliability in drag-free control.

    During operations, the satellite will be monitored, operated and controlled by the Flight Operations Segment (FOS) at ESA’s European Space Operations Centre (ESOC) in Darmstadt, Germany.

    ESOC generates and uplinks commands to programme GOCE’s operations, and processes the housekeeping and instrument data to monitor the health and performance of the satellite and instruments.

    GOCE data products
    GOCE data products

    For around 20 months, GOCE will gather data to map Earth’s gravity field with unprecedented accuracy and spatial resolution. The final gravity map and model of the geoid will provide users worldwide with well-defined data products. These will be instrumental in advancing science and applications in a broad range of disciplines.

    All products will be available free of charge to scientific and non-commercial users. A number of steps have to be taken in order to turn the raw data gathered by GOCE into products suitable for the users worldwide.

    This part of the mission is taken care of by the so-called ground segment, which is made up of three main elements – monitoring and control of the spacecraft, data processing and archiving and distribution. Additionally, services to provide users with online data access are part of this.

    Kiruna, Sweden
    ESA station in Kiruna, Sweden

    Raw data are downlinked from the satellite to ground stations in Kiruna (Sweden) and Svalbard (Norway).

    Upon receipt, the data are immediately forwarded over a fast network to the FOS in ESOC, which relays them to the Payload Data Ground Segment (PDGS) at ESA’s European Space Research Institute (ESRIN), in Frascati, Italy, where the data undergo an important transformation from telemetry to level-1b data products.

    These level-1b data are subsequently processed to level-2, the fundamental products that will be available to users worldwide, through the High-level Processing Facility (HPF).

    Rate this

    Views

    Share

    • Currently 0 out of 5 Stars.
    • 1
    • 2
    • 3
    • 4
    • 5
    Rating: 0/5 (0 votes cast)

    Thank you for rating!

    You have already rated this page, you can only rate it once!

    Your rating has been changed, thanks for rating!

    31
    facebook
    twitter
    reddit
    google plus
    digg
    tumbler
    digg
    blogger
    myspace
    • Operations
    • GOCE Operations
    • Kiruna station
      • Svalbard station
      • A virtual tour of ESOC, ESA's Space Operations Centre
        A virtual tour of ESOC, ESA's Space Operations Centre
        ESOC
      • ESRIN website
        ESRIN website
        ESRIN
      • In depth
      • EO Principal Investigator Portal
      • Access GOCE data

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • Google Buzz
    • Subscribe
    • App Store
    • LATEST ARTICLES
    • · CryoSat hits land
    • · Ariane 5 completes seven launches …
    • · Measuring skull pressure without t…
    • · Malargüe station inauguration
    • · The solar wind is swirly
    • FAQ

    • Jobs at ESA

    • Site Map

    • Contacts

    • Terms and conditions