• → European Space Agency

      • Space for Europe
      • Space News
      • Space in Images
      • Space in Videos
    • About Us

      • Welcome to ESA
      • DG's News and Views
      • For Member State Delegations
      • Business with ESA
      • ESA Exhibitions
      • ESA Publications
      • Careers at ESA
    • Our Activities

      • Space News
      • Observing the Earth
      • Human Spaceflight
      • Launchers
      • Navigation
      • Space Science
      • Space Engineering
      • Operations
      • Technology
      • Telecommunications & Integrated Applications
    • For Public

    • For Media

      • Media
      • ESA TV
      • Videos for professionals
      • Photos
    • For Educators

    • For Kids

    • ESA

    • Operations

    • Ground Systems Engineering

    • Space Debris

    • SSA

    • Operations
    • Operations home
    • Background
    • About Operations
    • The Right Stuff
    • Multimedia

      • Images
      • Videos
    • SSA programme
    • Space Situational Awareness
    • Teams on ground
    • Ground Systems Engineering
    • EGOS - Ground operation system
    • Missions in space
    • Solar and planetary
    • Astronomy & fundamental physics
    • Earth observation
    • Human spaceflight
    • Technology demonstration
    • Estrack operations
    • Past missions
    • ESA mission history
    • - Find a mission: A...Z
    • Mission control centres
    • ATV Control Centre (ATV-CC)
    • Columbus Control Centre (Col-CC)
    • Ground stations
    • Estrack tracking stations
    • ESTRACK Control Centre
    • - Find a station: A...Z
    • OPS Community
    • Advanced Operations Concepts Office
    • HSO Exchange
    • Knowledge Management at ESA's Operations team

    ESA > Our Activities > Operations

    GOCE completes early orbit phase

    Smiling faces: GOCE team from industry and ESA at end of LEOP
    20 March 2009

    ESA's GOCE satellite was formally declared ready for work at 01:00 CET on 20 March. During the critical Launch and Early Orbit Phase beginning with separation from its booster on 17 March, GOCE was checked out to confirm that all of its control systems are operating normally.

    The end of the Launch and Early Orbit Phase (LEOP) came overnight after GOCE was switched to Fine Pointing Mode. This means that all of its systems are working normally and the satellite is ready for full commissioning of its scientific instruments. With the end of LEOP, normal communications between the satellite and the ground are now being provided by ESA's ESTRACK station at Kiruna, Sweden.

    "Everything is working well and we have a healthy satellite. Today, we will end round-the-clock staffing in the Main Control Room and move the Flight Control Team to regular work-day operations in the Dedicated Control Room," said Flight Operations Director Pier Paolo Emanuelli speaking this morning at ESA's European Space Operations Centre (ESOC), Darmstadt, Germany.


    Satellite-to-satellite tracking in operation

    GOCE tracked by GPS
    Animation: GOCE tracked by GPS satellites

    A major aim of this week's LEOP work was to bring the Satellite-to-Satellite Tracking Instrument (SSTI) - a highly accurate GPS (Global Positioning Satellite) receiver - into full operation. Emanuelli confirmed that it is working normally.

    "Switching on the SSTI was especially important, as this meant the satellite could start performing its own autonomous orbit determinations. SSTI identifies GOCE's position very accurately, and we need this functioning before we can bring the satellite into its final drag-free operations mode," he said.

    First science data sets already received

    Deputy Flight Operations Director P. Ferri (L) & GOCE Mission Manager R. Floberghagen in Main Control Room

    In addition to providing realtime navigation data for flight control, SSTI is one of GOCE's two payload instruments and it is a very accurate scientific tool for recording and reconstructing the satellite's actual orbit. The first SSTI data have already been received at the Payload Data Ground Segment at ESA's Earth Observation Centre (ESRIN), Frascati, Italy.

    "Receiving initial science data from SSTI so soon has been an excellent first step and, now that the SSTI is operating, we are already proceeding with commissioning of the scientific payload," said GOCE Mission Manager Rune Floberghagen, who worked in ESOC's Main Control Room alongside the Mission Control Team during LEOP to monitor progress.

    Realtime graphic of GOCE orbiting in Fine Pointing Mode (click for hi-resolution)

    "GOCE is operating very well, and we are already looking forward to commissioning our other main instrument, the Electrostatic Gravity Gradiometer, starting in mid-April. It's going to be a very busy but tremendously exciting time as we begin science operations," said Floberghagen.

    In the coming weeks, the mission is expected to achieve a number of crucial milestones, including switching on the electric ion propulsion, switching into Drag-Free Attitude Control mode and lowering the orbit to the planned altitude of about 260 km.

    Rate this

    Views

    Share

    • Currently 0 out of 5 Stars.
    • 1
    • 2
    • 3
    • 4
    • 5
    Rating: 0/5 (0 votes cast)

    Thank you for rating!

    You have already rated this page, you can only rate it once!

    Your rating has been changed, thanks for rating!

    81
    Tweet
    • GOCE launch
    • Spacecraft Operations
      Spacecraft Operations
      Operations
    • Track GOCE
    • Related news
      • GOCE: Critical operations ongoing
        • ESA launches Earth Explorer mission GOCE
          • Launch readiness confirmed
            • Launch of ESA’s gravity mapping satellite delayed
            • In depth
              • Kiruna station
              • ESRIN

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • G+
    • Facebook
    • Livestream
    • Subscribe
    • App Store
    • ESA Operations Twitter

    Follow ESA operations

    • LATEST ARTICLES
    • · The fast winds of Venus are gettin…
    • · ExoMars 2016 set to complete const…
    • · Herschel ends operations as orbiti…
    • · Europe’s largest spaceship reache…
    • · ATV ready to nose up to Station
    • FAQ

    • Jobs at ESA

    • Site Map

    • Contacts

    • Terms and conditions