19.09.02 SCAPE suit used in fueling operations

September 2002

20.09.02 Final assembly work on Proton’s first 3 stages for Integral
21.09.02. Dressed in SCAPE suits preparing for fuelling
21.09.02 Dressing in the Scape suit
21.09.02 Fuelling operations being checked on the monitors
Test conductors
21.09.02. Test conductors
21.09.02. Back-up team
The observer team
21.09.02 The observer team, double-checking the completion of the step-by-step procedure
30.09.02. Sailing across the clean room
30.09.02 Integral approaches the gantry

Last update: 29 September 2004

Copyright 2000 - 2014 © European Space Agency. All rights reserved.