stay updated
Subscribe to our newsletter to receive the latest news, mission updates, and exclusive insights directly in your inbox. Be the first to know about our upcoming projects and breakthroughs.
Aestus | Engine of the Ariane-5 upper storable propellant stage |
Apogee | Furthest point from Earth of an orbit |
Ariane launch zone | Area at Europe’s Spaceport from where the Ariane 5 lifts off |
Attitude | The orientation of a spacecraft in relation to its direction of motion |
BAF | see Final Assembly Building |
BEAP | see Booster Engine Test Stand |
BIL | see Launcher Integration Building |
BIP | see Booster Integration Building |
Booster | Boosters are added to a launcher to provide the main thrust at liftoff - they consist of a casing containing the propellant, a solid rocket motor and additional equipment such as the igniter and the forward skirt equipped with a recovery system Etage d'accéleration à poudre (EAP) |
Booster Casing Preparation Building | Building at the Spaceport where the booster casings are prepared Batiment préparation étage (BPE) |
Booster Engine Test Stand | Place where booster engines are tested at Europe's Spaceport Banc d'essais des accélération à poudre (BEAP) |
Booster Integration Building | Building at the Spaceport where the integration of the Ariane-5 solid booster stage takes place Bâtiment d'intégration des propulseurs (BIP) |
Booster Separation Rockets | These separate the booster from the launch vehicle after approximately two minutes flight |
Booster Storage Building | Place at Europe's Spaceport where the boosters are stored until needed Bâtiment Stockage Etage (BSE) |
BSE | Bâtiment stockage Etage see Booster Storage Building |
CNES | Centre National d'Etudes Spatiales, French Space Agency |
Constellation | Space network composed of multiple small satellites, generally placed in low Earth or intermediary orbits |
Cryogenic propulsion | High performance propulsion that uses liquid hydrogen propellant and liquid oxygen as oxydiser |
CSG | Centre Spatial Guyanais - Guiana Space Centre also known as Europe's Spaceport |
DAAR | Dispositif d'Accrochage Arrière - Rear booster attachment and release mechanism |
DAAV | Dispositif d'Accrochage Avant - Forward booster attachment and release mechanism |
EAP | Etage Accélérateur à Poudre - see booster |
ELA-3 | Ariane-5 launch complex containing the Launcher Integration Building, the Final Assembly Building, the Solid Propellant Booster Integration Building and the propellant plants |
EPC | Etage Principal Cryogénique - see Main cryogenic stage |
EPCU S5 | Ensemble de Préparation des Charges Utiles - see Satellite Preparation Facility |
EPS | see Storable propellant stage |
ESA | European Space Agency |
Fairing | Used to protect satellites before and during the launch, and while crossing the lower levels of the atmosphere; it is jettisoned once the launcher leaves the Earth's orbit |
Final Assembly Building | Place at Europe's Spaceport where the launcher is finally assembled with the payload and checks are carried out Bâtiment d'Assemblage Final (BAF) |
GEO | see Geostationary orbit |
Geostationary orbit | An orbit which circles the Earth above the equator from east to west at an attitude of 36 000 km (GEO) |
Geostationary transfer orbit | An elliptical orbit whose apogee is at approximately 36 000 km, used to place a satellite into GEO (GTO) |
GTO | see Geostationary transfer orbit |
Guiana Space Centre | The French Space Centre in French Guiana also known as Europe's Spaceport Centre Spatial Guyanais (CSG) |
Hydrazine | A colourless basic liquid made from sodium hypochlorite and ammonia used chiefly as a rocket fuel |
Interstage | This provides the mechanical interface between two launcher stages and also hosts the separation device, the thrust vector control electrical unit and the batteries |
Jupiter Control Centre | Ariane-5 mission control building |
Launch zone | The launcher is transferred to this area 48 hours before launch for final propellant filling, countdown and launch |
Launcher Integration Building | Place at Europe's Spaceport where the launcher's main stage is integrated with the boosters Bâtiment d'Intégration Lanceur (BIL) |
LEO | see Low Earth orbit |
LH2 Plant | Facilities at Europe's Spaceport for producing liquid hydrogen for the Ariane-5 main cryogenic stage engine |
Low Earth orbit | Generally considered to be an orbit at an altitude of 400 to 1000 km (LEO) |
LOX Plant | Facilities at Europe's Spaceport for producing liquid oxygen for the Ariane-5 main stage and the Vulcain engine |
Main cryogenic stage | The main cryogenic stage of the Ariane 5 includes the cryogenic tank and the Vulcain engine; the duration of burnout is about 10 mins - the time needed for the launcher to leave the Earth's atmosphere Etage Principal Cryotechnique (EPC) |
MPS | Moteur Propergol Solide - the booster's solid rocket motor |
Orbit | The path followed by a satellite around a celestial body |
P80 solid rocket motor | Vega's first stage motor with a combustion time of 107 s |
P120C solid rocket motor | Vega-C first stage motor and Ariane 6 booster |
P160C solid rocket motor | Upgraded Vega-C first stage motor and Ariane 6 booster with over 14 tonnes more solid propellant. The “P” in its name stands for “Powder”, as the 3.4-m cylinder houses solid propellant. The number 160 designates the 160 tonnes of propellant inside, and the C stands for “Common” as the motor is used on the two launchers. |
Payload | The useful mass that can be carried and injected into orbit by a launcher; it could be a satellite, a module or a capsule |
Payload adapters | A device used to support satellites |
Perigee | Point of an orbit closest to the Earth |
Polar orbit | An orbit that passes over the polar regions from north to south |
Satellite Preparation Facility | Complex at Europe's Spaceport where satellites are prepared for launch Ensemble de preparation de charges utiles (EPCU S5) |
Skirt | Structure that joins together two parts of a launcher's or booster's stage and which transmits mechanical forces from the engine to the other structures of the launcher |
Solid Booster Integration Building | Place at Europe's Spaceport where booster segments are integrated Bâtiment d'intégration des propulseurs (BIP) |
Solid rocket motor | Motor of the Ariane-5 solid propellant booster (MPS) |
Soyuz launch zone | Area at Europe's Spaceport from where the Russian Federeation Soyuz launcher will lift off in 2007 |
Speltra | Multiple launch carrier structure that supports the upper payload and encapsulates the lower payload, protecting it from acoustic vibrations and thermal flow |
Stage | Term used for a complete element of a launch vehicle, i.e. propellant tank, one or more engines and electrical, mechanical or pneumatic equipment |
Storable propellant stage | This is the Ariane-5 upper stage - after 25 mins of thrust this reaches the orbiting speed of 28 000 km/h needed to release satellites into GTO Etage à propergols stockables (EPS) |
SSO | see Sun-synchronous orbit |
Sun-synchronous orbit | A polar orbit which is synchronous with the Sun, usually at an altitude of between 600-800 km (SSO) |
Sylda-5 | Multiple launch carrier structure housed inside the fairing - the Sylda 5 is smaller than the Speltra |
Technical Centre | Administration buildings and control rooms at the Spaceport |
Telemetry | Telecommunication of the readings of measuring instruments to a device on which the readings can be indicated or recorded |
UPG | Solid-propellant plant at Europe's Spaceport Usine de propergol de Guyane (UPG) |
VEB | see Vehicle equipment bay |
Vega | A European launcher schedule to make its first flight in 2006 from Europe's Spaceport |
Vega launch zone | Area at Europe's Spaceport from where Vega will lift off |
Vega AVUM upper stage | Upper stage of Vega consisting of a liquid propellant system, an attitude control system and the core of Vega's avionics system |
Vehicle equipment bay | The brains of an Ariane-5 launcher, this groups the main electronic elements that control the launcher |
Vulcain engine | Cryogenic engine of the Ariane-5G main stage |
Zefiro 23 solid rocket motor | The Vega second stage motor with a combustion time of 71.6 s |
Zefiro 9 solid rocket motor | Vega 3rd stage solid rocket motor with a combustion time of 110 s |
ZL | Zone de lancement see Launch zone |
ZLA | see Ariane 5 launch zone |
ZLS | see Soyuz launch zone |
ZLV | see Vega launch zone |
Subscribe to our newsletter to receive the latest news, mission updates, and exclusive insights directly in your inbox. Be the first to know about our upcoming projects and breakthroughs.