• → European Space Agency

      • Space for Europe
      • Space News
      • Space in Images
      • Space in Videos
    • About Us

      • Welcome to ESA
      • DG’s blog
      • For Member State Delegations
      • Business with ESA
      • Law at ESA
      • ESA Exhibitions
      • ESA Publications
      • Careers at ESA
      • ESAshop
    • Our Activities

      • Space News
      • Observing the Earth
      • Human and Robotic Exploration
      • Space Transportation
      • Navigation
      • Space Science
      • Space Engineering & Technology
      • Operations
      • Telecommunications & Integrated Applications
      • Preparing for the Future
    • Careers at ESA

    • For Media

      • Media
      • ESA TV
      • Videos for professionals
      • Photos
    • For Educators

    • For Kids

    • ESA

    • Space Transportation

    • Launch vehicles

    • Europe's Spaceport

    • New Technologies

    • Space Rider

    • About Space Transportation
    • Our strategy
    • Our programmes
    • Future Launchers Preparatory Programme
    • Working with industry
    • Europe's launchers
    • Operational launchers
    • Future launchers
    • A look at the past
    • Launches
    • Previous launches
    • Launch schedule
    • Multimedia
    • Image gallery
    • Video gallery
    • RSS feeds
    • Flyers
    • Vega - Europe's small launcher
    • Soyuz - Europe's launch site for Soyuz
    • IXV - Intermediate eXperimental Vehicle
    • Ariane 5
    • Ariane 6 and Vega-C - New generation of European launchers
    • Services
    • Glossary
    • Frequently asked questions
    • Comments

    ESA > Our Activities > Space Transportation

    Loading...
    Complex Ariane 6 launch table transfer
    Access the video

    Ariane 6 launch table now on pad

    20 September 2018

    The 700 tonne steel table that will support Ariane 6 at liftoff is now on the pad at Europe’s Spaceport in French Guiana.

    This structure is so large that it arrived in parts by ship in February, was then welded together and fitted with equipment at a preparation area about 250 m from the launch pad.   

    Moving this giant 4 m high, 20 m long and 18 m wide table into its permanent position on the centre of the pad is complex.  

    Four hydraulic jacks lifted the table, then two trollies moved the table to the edge of the launch pad. 

    A temporary railway and a mechanical guidance system helped roll the table into position over the centre of the pad where it will be lowered with millimeter precision into its final position in the coming days. 

    Further mechanical, fluidic and electrical equipment will be installed inside and outside the table.

    Activities at Europe’s Spaceport continue to make headway with the next major works involving the integration of the mast as well as the exhaust ‘deflector’ that will sit at the base of the concrete flame duct reaching 25 m below the launch table.

    Ariane 6’s first flight is planned for mid-2020.

    Rate this

    Views

    Share

    • Currently 5 out of 5 Stars.
    • 1
    • 2
    • 3
    • 4
    • 5
    Rating: 5/5 (25 votes cast)

    Thank you for rating!

    You have already rated this page, you can only rate it once!

    Your rating has been changed, thanks for rating!

    1339
    Tweet

    Related articles

    Ariane 6 launch table takes shape in Kourou16 February 2018

    Ariane 6 launch table takes shape in Kourou16 February 2018 The table that will support Ariane 6 on the pad is being assembled at Europe’s Spaceport in French Guiana.

    • Ariane 6 animation
    • Ariane 6 overview
    • ESA TV: Ariane 6 - a reality in Kourou
    • External links
    • CNES
    • App Store
    • Subscribe
    • mobile version
    • ESA STS Twitter

    @ESA_STS

    • FAQ

    • Site Map

    • Contacts

    • Terms and conditions