06:36 CEST, 17 October 2002:
Proton rocket declared ready for launch
06:18 CEST, 17 October 2002:
Transition to internal power completed
06:11 CEST:
Integral declared ready for launch.
05:56 CEST, 17 October 2002
Completion service tower rollback. Windspeed 31 m/s.
05:26 CEST, 17 October 2002
Start of roll back of service tower from the Proton rocket at Baikonur. All nominal.
04:33 CEST, 17 October 2002
Mission Control at ESOC commences voice and status checks with all ground stations.
03:46 CEST, 17 October 2002
Integral spacecraft powered up. Sunrise.
03:41 CEST, 17 October 2002
Integral spacecraft is switched on and telemetry received.
03:31 CEST, 17 October 2002
Completion propellant loading of Proton launch vehicle.
Outside temperature -5.5°C, Fairing temperature 17°C.
00:41 CEST, 17 October 2002
Countdown starts at ESOC; loading of propellant on the Proton launcher in Baikonur commences.
23:00 CEST, 16 October 2002
Everything is still on track for launch. Weather conditions are acceptable for launch
11.00 CEST, 16 October 2002
Integral Flight Operations Director says Integral is GO for launch. Launch is on schedule for 06:41 from Baikonur in Kazakhstan.