STS-134 mission original schedule

International Space Station during STS-134
31 MAR. 2011 publication date 1121 Views

Flight Day 1

  • Launch
  • General support computer activation
  • Shuttle Remote Manipulator System checkout

Flight Day 2

  • Thermal protection system inspection
  • EVA suits checkout
  • Rendezvous preparation

Flight Day 3

  • Rendezvous pitch manoeuvre
  • Rendezvous and docking to ISS with Orion Relative Navigation System activation
  • Hatch opening, ingress ISS, middeck transfers
  • Deployment of Express Logistics Carrier 3

Flight Day 4

  • Deploy AMS-02 from Shuttle and berth to ISS, using both the Space Station Remote Manipulator System and the Shuttle Remote Manipulator System
  • First Extra Vehicular Activity (EVA-1) preparation

Flight Day 5

  • EVA-1 by Feustel and Chamitoff. Each spacewalk will last about six hours
  • Retrieve MISSE 7experiment containers from ISS and install them in Shuttle Bay
  • Remove MISSE 8 experiment container from Shuttle Bay and install it on ISS
  • Fluid line routing

Flight Day 6

  • Focused inspection
  • Water dump
  • EVA-2 preparation

Flight Day 7

  • EVA-2 by Feustel and Fincke
  • Inspect and lubricate Port Solar Array Rotary Joint
  • Fluid line routing and ammonia fill
  • Water dump

Flight Day 8

  • Late inspection with Orbiter Boom Sensor System with Endeavour still docked to the ISS
  • Shuttle crew half day off-duty
  • EVA-3 preparation

Flight Day 9

  • EVA-3 by Feustel and Fincke
  • Integrated Boom Assembly stowed on the truss orbital support equipment
  • Swap Electrical Flight and Power & Data Grapple Fixture
  • Perform preparation tasks on spare Special Purpose Dexterous Manipulator
  • Middeck transfers

Flight Day 10

  • Added flight day to accommodate work on the U.S. carbon dioxide removal system and other maintenance tasks.

Flight Day 11

  • Off duty, crew conference
  • Experiment stow, hatch close
  • EVA-4 preparation

Flight Day 12

  • EVA-4 by Fincke and Chamitoff
  • Integrated Boom Assembly stowed on the truss orbital support equipment
  • Undock from ISS
  • Fly-around with Orion Relative Navigation System activation
  • Re-rendezvous for Orion Relative Navigation System Test

Flight Day 13

  • Flight Control Systems checkout
  • Cabin stow
  • Entry preparation

Flight Day 14

  • Deorbit preparation
  • Entry and landing

Related links

fallback image 2
fallback image 4

stay updated

Subscribe to our newsletter to receive the latest news, mission updates, and exclusive insights directly in your inbox. Be the first to know about our upcoming projects and breakthroughs.