Although the satellite's life in orbit is now over, the mission is only getting started as scientists use the data to understand more about our planet.
11 November 2013
Life in orbit ends as the GOCE satellite reenters Earth's atmosphere
October 2013
GOCE runs out of fuel
21 October 2013
Geoid combined with altimetry data to improve measurements of ocean surface currents
October 2013
GOCE provides information about upper atmosphere densities and wind speeds
September 2013
Data used to study geodynamics in Earth's lithosphere
March 2013
Analysing earlier GOCE data, scientists discovered that GOCE had detected sound waves in space from earthquake that hit Japan in 2011
February 2013
Data used to settle long-standing debate on slope of sea
November 2012
Planned mission complete but decision made to lower orbit to 235 km since fuel consumption lower than anticipated because of low solar activity
March 2012
GOCE data used to map the Moho
March 2011
Scientists have access to the most accurate model of the geoid every produced
November 2010
GOCE granted 18-month extension
29 September 2010
GOCE resumes normal service
6 September 2010
GOCE recovers from telemetry glitch that had prevented the satellite from sending its scientific data to Earth for several weeks
29 June 2010
First global gravity model presented at ESA’s Living Planet Symposium
September 2009
GOCE in measurement mode
17 March 2009
GOCE launched at 15:21 CET!
16 March 2009
Launch operations stopped a few seconds before liftoff due to an anomaly in the launch tower. Launch rescheduled for 17 March 2009
4 February 2009
Planned launch date of 16 March 2009 announced
24 October 2008
Launch delayed until 2009
16 October 2008
Tentative 27 October launch date postponed to allow conclusion of technical equiry
2 October 2008
New tentative launch date of 27 October 2008 set
8 September 2008
GOCE launch delayed due to an anomaly in the guidance and navigation subsystem of the launcher's upper stage (Breeze KM ). Launch rescheduled for 5 October 2008
1 September 2008
GOCE encapsulated in the fairing of the Rockot launch vehicle
1 August 2008
GOCE arrives at Plesetsk Cosmodrome for start of launch campaign
29 July 2008
GOCE en route to Russia’s Plesetsk Cosmodrome
May-June 2008
GOCE satellite reconfigured for September launch
May 2008
New launch date set for GOCE: 10 September 2008
March 2008
GOCE media day at ESA/ESTEC
August 2007
GOCE arrives at ESA-ESTEC in the Netherlands for final testing
March 2007
Instruments integrated into gradiometer at Alcatel Alenia Space, Cannes, France
February 2007
GOCE Mission Advisory Group Meeting at Alcatel Alenia Space, Turin, Italy during integration and testing of GOCE Flight Model
December 2006
High-Level Processing Facility acceptance review successfully passed
November 2006
Third International GOCE User Workshop, at ESA-ESRIN, Frascati, Italy
October 2006
Announcement of Opportunity for the Exploitation of GOCE Data released
September 2006
GOCE platform delivered to Alcatel Alenia Space for final integration of flight model
July 2006
Payload Data Segment (PDS) and Instrument Processing Facility (IPF) acceptance in ESA-ESRIN, Frascati, Italy