• → European Space Agency

      • Space for Europe
      • Space News
      • Space in Images
      • Space in Videos
    • About Us

      • Welcome to ESA
      • DG's News and Views
      • For Member State Delegations
      • Business with ESA
      • ESA Exhibitions
      • ESA Publications
      • Careers at ESA
    • Our Activities

      • Space News
      • Observing the Earth
      • Human Spaceflight
      • Launchers
      • Navigation
      • Space Science
      • Space Engineering
      • Operations
      • Technology
      • Telecommunications & Integrated Applications
    • For Public

    • For Media

    • For Educators

    • For Kids

    • ESA

    • Operations

    • Ground Systems Engineering

    • Space Debris

    • SSA

    • Operations
    • Operations home
    • Background
    • About Operations
    • The Right Stuff
    • Multimedia

      • Images
      • Videos
    • SSA programme
    • Space Situational Awareness
    • Teams on ground
    • Ground Systems Engineering
    • EGOS - Ground operation system
    • Missions in space
    • Solar and planetary
    • Astronomy & fundamental physics
    • Earth observation
    • Human spaceflight
    • Technology demonstration
    • Estrack operations
    • Past missions
    • ESA mission history
    • - Find a mission: A...Z
    • Mission control centres
    • ATV Control Centre (ATV-CC)
    • Columbus Control Centre (Col-CC)
    • Ground stations
    • Estrack tracking stations
    • ESTRACK Control Centre
    • - Find a station: A...Z
    • OPS Community
    • Advanced Operations Concepts Office
    • HSO Exchange
    • Knowledge Management at ESA's Operations team

    ESA > Our Activities > Operations

    Intensive preparations for ATV freighter launch to Space Station

    ESA's ATV Control Centre during simulation training 27 January 2011
    28 January 2011

    The fuel and most of the cargo are loaded and ATV has been hoisted to the top of Ariane 5 as teams on four continents prepare for the 15 February launch of Johannes Kepler from Europe's Spaceport in Kourou, French Guiana.

    With launch scheduled in just 18 days, experts from ESA, partner agencies and industry teams are in the busy final stage of making Johannes Kepler ready for space.

    Liftoff is set for 15 February at 22:07 GMT (23:07 CET) from Kourou. After eight days of orbital manoeuvres that will enable the Automated Transfer Vehicle (ATV) to synchronise its orbit with that of the International Space Station (ISS), the cargo vessel will dock on 23 February.

    Experts at Kourou handle ATV with care

    ATV Johannes Kepler mounted inside the CCU container for transport to the final assembly building

    In the past week at Kourou, experts from ESA and Arianespace carefully fitted ATV into a large protective container to transfer it to the giant vertical integration building.

    The transfer took place on 20 January using a massive trailer at a maximum speed of just 15 km/hour.

    ATV was removed from the container and, on 25 January, was lifted to the top of the Ariane 5 launcher that will carry it into space.

    The vessel is now being integrated onto the launcher together with the adapter that serves as the interface with Ariane. In addition, the white insulating foil layer that thermally protects ATV from the enormous temperature changes in orbit is being attached.


    "There is an incredible amount of hard work being done in these final weeks by teams from ESA, CNES, Arianespace and our partners. It's gratifying to see such dedication to making Johannes Kepler ready for flight," said Nico Dettmann, ESA's ATV Programme Manager.

    Team work and training at ATV-CC

    At the ATV Control Centre (ATV-CC) in Toulouse, France, mission controllers from ESA and CNES, the French space agency, have been making final checks of the mission control infrastructure.

    On 28 January, the mission control team conducted a simulation of the critical launch and early orbit phase. On 29 January, a test of the ground control system between ATV and the control centre will see controllers receiving live signals via cable from ATV mounted on top of Ariane.

    http://blogs.esa.int/atv
    Follow the ATV-2 mission via http://blogs.esa.int/atv

    On 2 February, ATV-CC will conduct a final rehearsal involving all ISS control centres covering the flight period from rendezvous with the ISS up to docking. A dress rehearsal of the final countdown will be held on 9 February and will include the Arianespace launch control centre in Kourou.

    "The operations teams from ESA, CNES and our industrial partners have worked very hard to make sure everything is ready, including many long hours of training to be ready in case of any contingencies. We are ready for ATV's flight and everyone is keen to get to liftoff," said Alberto Novelli, ESA's ISS Operations Manager.

    The launch of Ariane 5 and the flight of ATV-2 will make use of ESA tracking stations at Santa Maria, Portugal; Maspalomas and Villafranca, Spain; Redu, Belgium; and, Perth, Australia. The network is centrally controlled from ESOC, ESA's Space Operations Centre in Germany.

    Rate this

    Views

    Share

    • Currently 0 out of 5 Stars.
    • 1
    • 2
    • 3
    • 4
    • 5
    Rating: 0/5 (0 votes cast)

    Thank you for rating!

    You have already rated this page, you can only rate it once!

    Your rating has been changed, thanks for rating!

    39
    Tweet
    • Follow the ATV Johannes Kepler misison via ESA's ATV blog
      Follow the ATV Johannes Kepler misison via ESA's ATV blog
      ATV blog
    • Automated Transfer Vehicle (ATV)
    • ATV-2 Johannes Kepler mission logo
      ATV-2 Johannes Kepler mission logo
      ATV-2 Mission logo
    • Related articles
      • Europe’s ATV space ferry ready for launch
        • ATV Johannes Kepler gears up for space journey
          • Second ATV named after Johannes Kepler
            • ATV Johannes Kepler cargo section arrives in Bremen
              • Second ATV heading to Kourou for launch
              • Related links
                • International Space Station
                • EADS Astrium

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • G+
    • Facebook
    • Livestream
    • Subscribe
    • App Store
    • ESA Operations Twitter

    Follow ESA operations

    • LATEST ARTICLES
    • · Space drives e-mobility
    • · Proba-V opens its eyes
    • · First new Galileo satellite arrive…
    • · Next destination: space
    • · Leak repaired on International Spa…
    • FAQ

    • Jobs at ESA

    • Site Map

    • Contacts

    • Terms and conditions