ESA title
The contract was signed today in Paris
Applications

MSG-4 contract means sunny outlook for European weather for…

02/11/2004 1313 views 0 likes
Read
Coupling of the MetOp-FM2 satellite modules
Applications

MetOp-2 satellite in last stages of testing

13/10/2004 1895 views 0 likes
Read
Meteosat-8 imagery of West African dust storm
Applications

Europe's MSG weather satellite serves scientists as well as…

15/09/2004 986 views 0 likes
Read
GOME-2 team Galileo Avionica
Applications

GOME-203 passes acceptance testing

03/05/2004 455 views 0 likes
Read
José Achache
Applications

ESA’s future weather satellite activities unveiled

25/09/2003 1072 views 1 likes
Read
A virtually cloud-free Europe captured by MSG-1
Applications

A cloud-free Europe captured by MSG-1

26/08/2003 1546 views 0 likes
Read
First GERB images taken on 12 December 2002
Applications

Innovative instrument on board MSG-1 delivers key informati…

13/12/2002 975 views 0 likes
Read
MSG-1 first image - 28 November 2002
Applications

MSG-1 first image unveiled

11/12/2002 4074 views 2 likes
Read
Europe viewed by Meteosat
Applications

MSG: the countdown begins to a new era in European weather…

10/12/2002 847 views 0 likes
Read
Meteosat Second Generation (MSG)
Applications

MSG-1 weather satellite ready for commissioning

27/09/2002 1340 views 1 likes
Read
Liftoff of Ariane 5 Flight 155
Applications

Flawless launch of a super Meteosat

29/08/2002 950 views 0 likes
Read
En route for the launch pad
Applications

MSG-1 Launch Diary

27/08/2002 1380 views 0 likes
Read
MSG-1: a close-up look at the satellite preparations in the S5 facility
Applications

Follow the launch of MSG-1 from ESA and Arianespace establi…

21/08/2002 1156 views 0 likes
Read
The GOME-2 team at the start of the calibration
Applications

GOME-2 FM ready for instrument calibration

20/03/2002 515 views 1 likes
Read
GOME-2 team Galileo Avionica
Applications

GOME-2 passes acceptance testing in Galileo Avionica

07/03/2002 755 views 0 likes
Read
Applications

GOME-2 FM ready for testing

10/12/2001 403 views 0 likes
Read
GOME-2 calibration team
Applications

Engineering/Qualification Model undergoes calibration dry-r…

29/10/2001 1088 views 0 likes
Read
Teams involved in the Critical Design Review
Applications

GOME-2 Critical Design Review a success

25/07/2001 543 views 0 likes
Read
< 1 2 3 4 5