Mars500 is an international study into interplanetary spaceflights and is conducting in 2010-11 the first full duration simulation of a manned flight to Mars.
Timeline
November 2007: a 14-day simulation (tested the facilities and operational procedures)
31 March 2009: four Russian and two European crewmembers started a 105-day isolation study
14 July 2009: end of the 105-day study
23 March 2010: European candidates for the 520-day crew announced
18 May 2010: the whole 520-day crew announced
3 June 2010: start of the 520-day isolation study
3 Jun 2010: Beginning of experiment - hatch closed, lift off
15 Jun 2010: Undocking from orbital assembly laboratory
23 Jun 2010: Transfer to heliocentric orbit towards Mars
24 Dec 2010: Shifting to spiral orbit towards Mars
1 Feb 2011: Entering circular orbit around Mars
1 Feb 2011: Mars Lander hatch opening
8 Feb 2011: Completion of loading, Lander hatch closure
12 Feb 2011: Undocking, landing on Mars
14, 18 and 22 Feb 2011: Egresses on Martian surface
23 Feb 2011: Ascent, beginning of quarantine
24 Feb 2011: Docking with interplanetary craft
26 Feb 2011: End of quarantine
27 Feb 2011: Habitation module hatch opening
27 Feb 2011: Crew transfer to Habitation module
28 Feb 2011: Lander loading with trash ends
1 Mar 2011: Hatch closure, Lander undocking
2 Mar 2011: Entering into spiral orbit away from Mars
7 Apr 2011: Transfer to heliocentric orbit towards Earth
15 Sep 2011: End of communications delay, switchover to voice communications
13 Oct 2011: Shifting to spiral orbit towards Earth
4 Nov 2011: End of 520-day study, crew landing on Earth
(Note: all actions have been simulated.)
The facility:
four hermetically sealed interconnected habitat modules
one external module, 'martian surface'
total volume of the habitat modules is 550 m3.
During the mission:
the crew is hermetically isolated
‘surface operations’ after 250 days the crew will be divided in half, three will move to the martian surface simulator and three will remain in the ‘spacecraft’
crew live and work like astronauts on ISS
maintenance, scientific experiments and daily exercise.
a seven-day week, with two days off, except when special and emergency situations are simulated.
crew monitored and their psychological, medical and physical signs recorded
limited consumables
connection disrupted and with a realistic delays
communications delay varies from 8 to 736 sec with maximum delay on flight day 351
Mars500 is being conducted by Russia’s Institute of Biomedical Problems (IBMP), with extensive participation by ESA as part of its European Programme for Life and Physical Sciences (ELIPS) to prepare for future human missions to the Moon and Mars.