This is a summary of activities during Christer Fuglesang’s Alissé Mission and additional activities as part of the STS-128/17A mission. This does not provide a full explanation of all tasks being undertaken but provides an overview of the major tasks. The following timeline is also subject to change.
(For more detailed descriptions of the daily activities, download the ‘Daily activities’ section of the Alissé Mission Information Kit.)
Launch
Configure Shuttle for on-orbit activities
Checkout of Shuttle robotic arm
Shuttle heat shield check using robotic arm and robotic arm extension
EVA preparations including EVA suit checks
ISS rendezvous preparations
Rendezvous and docking including Shuttle backflip manoeuvre
Hatch opening/Welcome
Shuttle Mid Deck/ISS Cargo Transfer
MPLM transfer from Shuttle Cargo Bay to Node 2
MPLM activation and hatch opening
Cargo transfer
Preparations for EVA 1
EVA astronauts ‘campout’ in Quest Airlock to help remove nitrogen from their bodies
EVA 1 (Olivas & Stott) – P1 truss Ammonia Tank Assembly removal, Columbus laboratory EuTEF external facility removal and MISSE experiment removal
MPLM cargo transfer – Treadmill, Crew Quarters, Atmospheric Revitalization System
MPLM cargo transfers – MELFI 2, Fluids Integrated Rack, Materials Science Laboratory in the Material Science Research Rack
Shuttle heat shield check
EVA 2 preparations
EVA astronauts ‘campout’ in Quest Airlock to help remove nitrogen from their bodies
EVA 2 (Olivas & Fuglesang) – New Ammonia Tank Installation on P1 truss, Old P1 Ammonia Tank stowage in Shuttle Cargo Bay
Cargo Transfers
Crew off-duty time
EVA 3 preparations
EVA astronauts ‘campout’ in Quest Airlock to help remove nitrogen from their bodies
Cargo transfers
EVA 3 (Olivas & Fuglesang) – S0 truss to Node 1 docking port cabling for Node 3, Rate Gyro Assembly replacement, Remote Power Control Module replacement, installation of Payload Attachment System on S3 Truss, Pressurised Mating Adaptor 3 heater cable configuration, LAN cable configuration, slidewire removal
Cargo transfers
Final MPLM cargo transfer operations between ISS and Shuttle
ESA VIP in-flight call
Node 2 docking port control panel assembly installation.
ISS Flight Engineer handover procedures
MPLM closeout/deactivation and hatch closure
MPLM undocked and moved to Shuttle cargo bay
Final transfer operations between ISS and Shuttle
Crew farewells, Shuttle crew into orbiter and close hatches
Orbiter Docking System leak check
Undocking
Station flyaround
Shuttle heat shield survey
Landing preparations
Landing preparations
Deorbit
Landing