2003: On 18 September 2003, the last preparations for ESA's SMART-1 spacecraft were made in Europe's Spaceport in Kourou, French Guiana, to make it ready for its launch the following week.
SMART-1's Solar Array protections were removed and the space capsule made ready for flight. It was then enclosed by a 2.6 metre 'raising cylinder' on which was placed the second spacecraft to be launched at the same time, E-Bird. The previous day, 17 September, SMART-1 had been placed on top of its Ariane 5 launcher.
Modal de média
16 September
15 September
14 September
mantenha-se atualizado
Subscreva a nossa newsletter para receber as últimas notícias, atualizações de missões e conteúdos exclusivos diretamente na sua caixa de entrada. Seja o primeiro a saber sobre os nossos próximos projetos e avanços.