The platform-level integration tests on the engineering model of the Galileo in-orbit validation satellites have been completed at the Thales Alenia Space facility in Rome. The platform is currently undergoing functional testing. Delivery of the engineering model payload from Astrium UK is expected in December.
These tests are an important step in the process of building and launching the first four Galileo satellites. Integration testing is carried out to verify the correctness of the interfaces between the unit or subsystem under test and the larger system into which it has been integrated. The scope of functional testing is to demonstrate that the integrated units or subsystems are compliant with their design specification.
Modal de média
Modal de média
Four in-orbit verification satellites
Modal de média
Modal de média
Galileo: First contracts signed on behalf of the European Commission
Modal de média
Links relacionados
Galileo website (European Commission)
European GNSS Agency, GSA
mantenha-se atualizado
Subscreva a nossa newsletter para receber as últimas notícias, atualizações de missões e conteúdos exclusivos diretamente na sua caixa de entrada. Seja o primeiro a saber sobre os nossos próximos projetos e avanços.