• → European Space Agency

      • Space for Europe
      • Space News
      • Space in Images
      • Space in Videos
    • About Us

      • Welcome to ESA
      • DG's News and Views
      • For Member State Delegations
      • Business with ESA
      • ESA Exhibitions
      • ESA Publications
      • Careers at ESA
    • Our Activities

      • Space News
      • Observing the Earth
      • Human Spaceflight
      • Launchers
      • Navigation
      • Space Science
      • Space Engineering
      • Operations
      • Technology
      • Telecommunications & Integrated Applications
    • For Public

    • For Media

    • For Educators

    • For Kids

    • ESA

    • Home

    • Launch vehicles

    • Europe's Spaceport

    • New Technologies

    • Strategy for launchers
    • Launcher strategy
    • Future Launchers Preparatory Programme
    • International cooperation
    • Launchers and industry
    • Launcher history
    • A look at the past
    • Ariane 1, 2, 3
    • Ariane 4
    • Launches
    • Previous launches
    • Launch schedule
    • Multimedia
    • Image gallery
    • Video gallery
    • RSS feeds
    • Flyers
    • Vega - Europe's small launcher
    • Soyuz - Europe's medium launcher
    • IXV - Intermediate Experimental Vehicle
    • NGL - Europe's Next-Generation Launcher
    • Launchers on your desktop
    • Screensavers and wallpaper
    • Services
    • Glossary
    • Frequently asked questions
    • Comments

    ESA > Our Activities > Launchers

    Ariane 5’s third launch of 2010

    Ariane 5 flight V196
    Ariane 5 flight V196
    5 August 2010

    Yesterday evening, an Ariane 5 launcher lifted off from Europe’s Spaceport in French Guiana on its mission to place two telecommunications satellites, Nilesat-201 and Rascom-QAF1R, into geostationary transfer orbits.

    Liftoff of flight V196, the 52nd Ariane 5 mission, took place at 22:59 CEST (20:59 GMT; 17:59 French Guiana). The target injection orbit had a perigee altitude of 250 km, an apogee altitude at injection of 35 919 km and an inclination of 2º.

    The satellites were accurately injected into their transfer orbits about 28 minutes and 32 minutes after liftoff, respectively.

     
 
Nilesat-201 will be positioned in geostationary orbit at an altitude of about 35 800 km over the equator at 7°W and will provide broadband direct-to-home television broadcast services to North Africa and the Middle East in the Ku- and Ka-bands.

    Rascom-QAF1R, to be positioned at 2.85°E, will provide communications services in rural parts of Africa, including long-distance domestic and international links, direct TV broadcasts and Internet access. The payload mass for this launch was 7085 kg; the satellite masses totalled 6250 kg, with payload adapters and dispensers making up the additional 835 kg.

    Ariane 5 flight V196 liftoff

    Arianespace and Europe’s Spaceport are planning three more Ariane launches in 2010, maintaining the heavy-lift vehicle’s flight rate. The ability to sustain high launch rates has already been demonstrated: during the 12-month period from August 2007 to August 2008 there were nine launches (V177 – V185).


    V196 flight timeline


    Ariane 5’s cryogenic, liquid-propellant main engine ignited first. Seven seconds later, the solid-propellant boosters also fired, and the vehicle lifted off a fraction of a second later.

    The solid-propellant boosters were jettisoned 2 min 23 sec after main engine ignition, and the fairing protecting the payload during the climb through Earth’s atmosphere was discarded at 3 min 29 sec. The launcher’s main engine shut down at 8 min 53 sec; six seconds later, the main cryogenic stage separated from the upper stage and its payload.

    Four seconds after main stage separation, the engine of the cryogenic upper stage was ignited to continue the journey. This engine shut down 24 min 43 sec into the flight, at which point the vehicle was travelling at 9437 m/s (33 973 km/h) at an altitude of 556.8 km – and geostationary transfer orbit had been achieved.

    At 28 min 46 sec, Nilesat201 separated from the upper stage, followed by Rascom-QAF1R at 32 min 46 sec. Ariane 5’s flight was formally completed 48 min 50 sec after main engine ignition.

    Rate this

    Views

    Share

    • Currently 0 out of 5 Stars.
    • 1
    • 2
    • 3
    • 4
    • 5
    Rating: 0/5 (0 votes cast)

    Thank you for rating!

    You have already rated this page, you can only rate it once!

    Your rating has been changed, thanks for rating!

    23
    Tweet
    • Related news
      • Ariane 5’s third launch of 2010
        • Ariane 5’s second launch of 2010
          • First Ariane 5 launch of 2010
            • Fifth Ariane 5 launch of 2009
              • Ariane 5 – Dual launch of telecommunications satellites
                • Ariane 5 – Largest-ever telecommunications satellite launched
                  • ESA and Arianespace sign a Frame Contract for the procurement of launch services
                    • ESA en route to the origins of the Universe
                      • Ariane 5 – First launch of 2009
                      • Visit Kourou
                      • Countdown
                      • Build a launcher
                      • Ariane 5
                      • Vega
                      • Soyuz
                      • External links
                      • Arianespace

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • G+
    • Facebook
    • Livestream
    • Subscribe
    • App Store
    • LATEST ARTICLES
    • · ESA astronaut Timothy Peake set fo…
    • · Space drives e-mobility
    • · Proba-V opens its eyes
    • · First new Galileo satellite arrive…
    • · Next destination: space
    • FAQ

    • Jobs at ESA

    • Site Map

    • Contacts

    • Terms and conditions