• → European Space Agency

      • Space for Europe
      • Space News
      • Space in Images
      • Space in Videos
    • About Us

      • Welcome to ESA
      • DG's News and Views
      • For Member State Delegations
      • Business with ESA
      • ESA Exhibitions
      • ESA Publications
      • Careers at ESA
    • Our Activities

      • Space News
      • Observing the Earth
      • Human Spaceflight
      • Launchers
      • Navigation
      • Space Science
      • Space Engineering
      • Operations
      • Technology
      • Telecommunications & Integrated Applications
    • For Public

    • For Media

    • For Educators

    • For Kids

    • ESA

    • Operations

    • Ground Systems Engineering

    • Space Debris

    • SSA

    • Operations
    • Operations home
    • Background
    • About Operations
    • The Right Stuff
    • Multimedia

      • Images
      • Videos
    • SSA programme
    • Space Situational Awareness
    • Teams on ground
    • Ground Systems Engineering
    • EGOS - Ground operation system
    • Missions in space
    • Solar and planetary
    • Astronomy & fundamental physics
    • Earth observation
    • Human spaceflight
    • Technology demonstration
    • Estrack operations
    • Past missions
    • ESA mission history
    • - Find a mission: A...Z
    • Mission control centres
    • ATV Control Centre (ATV-CC)
    • Columbus Control Centre (Col-CC)
    • Ground stations
    • Estrack tracking stations
    • ESTRACK Control Centre
    • - Find a station: A...Z
    • OPS Community
    • Advanced Operations Concepts Office
    • HSO Exchange
    • Knowledge Management at ESA's Operations team

    ESA > Our Activities > Operations

    Significant milestone for Columbus flight readiness

    Cutaway view of Columbus laboratory
    22 January 2007

    In December 2006, experts from ESA and partner organisations met to review Columbus launch preparations. The successful review was a significant milestone for the launch of the Agency's science module, planned for later this year.

    The review meeting, known formally as the Flight Operations Readiness Review, included experts from ESA, NASA, the German Aerospace Agency (DLR), the Japanese space agency (JAXA) and industry, and concluded that ESA and its partners are on track for the launch of the Columbus scientific laboratory.

    Columbus is Europe's cornerstone contribution to the International Space Station (ISS), and is scheduled for launch on shuttle mission STS-122 in October/November 2007.

    A highly motivated team of engineers and experts will conduct the 13-day mission together with their counterparts at NASA.

    The Flight Operations Readiness Review was held 4-5 December 2006 at the Columbus Control Centre at Oberpfaffenhofen, near Munich, to review the state of preparation of the mission teams and ground infrastructure; it is a formal step required by NASA to check the state of readiness of its international partners in joint missions.

    Ground facilities established for Columbus were recently used during the 171-day Astrolab mission, completed by ESA Astronaut Thomas Reiter, of Germany, in December.


    Europe's ground preparations on track

    The review showed that ESA and partner preparations are on track and that the engineering, infrastructure and training tasks remaining to be done can be completed as planned prior to launch.

    ESA, NASA, others meet for Columbus readiness review

    The two-day review was a thorough and comprehensive review of readiness and looked at all areas related to the launch and start of operations for Columbus. The Columbus Control Centre is operated by DLR under contract from ESA.

    Review topics included NASA Shuttle flight planning status, payload operations, Columbus generic flight rules, shared documentation, Columbus Control Centre status, ground controller training and certification, flight crew training and the status of the USOCs, Europe's User Support and Operation Centres. These are located at the institutes and universities that will receive and analyse data returned from experiments onboard Columbus.

    Columbus Control Centre ready to control

    ESA's readiness to support the Columbus delivery mission 24 hours per day via the Columbus Control Centre was one of the key points examined during the review.

    ESA's Columbus Control Centre

    Bob Chesson, Head of ESA's Human Spaceflight and Exploration Operations department and a review participant, said that formal qualification and acceptance of the Columbus Control Centre are complete, confirming that the ground infrastructure is in good shape.

    "We have completed a full programme of system validation tests with the Columbus module demonstrating that the mission control systems can talk to the spacecraft; at this time we have not identified any issues that could change this encouraging status," he added.

    Chesson also said that, as a result of this review, "We have shown that the operations facilities and teams are on schedule to achieve operational readiness in time for launch."

    His colleague, Roland Luettgens, Operations Manager for Columbus, added that the Columbus flight control team is currently undergoing their certification for the Columbus flight. "They are a highly motivated team of engineers and experts who will conduct the 13-day mission together with their counterparts at NASA."

    ESA astronauts ready for demanding Columbus delivery mission

    Hans Schlegel
    German ESA astronaut Hans Schlegel

    ESA astronauts Hans Schlegel, from Germany, and Leopold Eyharts, from France, are two of the key participants in the Columbus delivery mission, coded as "ISS Assembly Flight 1E."

    "ESA astronaut Hans Schlegel has been assigned to Shuttle flight 1E - the Columbus launch on STS122 - will be trained on all aspects of the 1E mission, and will serve as an EVA crew member. Leopold Eyharts has been in training since last summer for Stage 1E, which starts with the Columbus launch and is part of Increment 16, and will receive all of the ISS increment training in anticipation of formal assignment, which is expected in the next few weeks; Stage 1E will last for about two to three months," said Michel Tognini, Head of the European Astronaut Centre.

    Columbus activity ramps up

    Columbus lab arrives at NASA, May 2006

    In upcoming months, activity related to the launch of Columbus will intensify.

    The module itself has already been shipped to NASA's Kennedy Space Center, arriving in Florida on 30 May 2006 via an Airbus A300-600 'Beluga' heavy lift aircraft.

    In March and April 2007, ESA and NASA technicians aided by contractor personnel will begin removing Columbus from temporary storage.

    ESA's single biggest ISS contribution

    The Columbus laboratory is ESA's biggest single contribution to the International Space Station. The 4.5-metre diameter cylindrical module is equipped with flexible research facilities that offer extensive science capabilities.

    During its 10-year projected life span, Earth-based researchers together with the ISS crew will be able to conduct thousands of experiments in life sciences, materials science, fluid physics and a host of other disciplines, all in the weightlessness of orbit.

    Rate this

    Views

    Share

    • Currently 0 out of 5 Stars.
    • 1
    • 2
    • 3
    • 4
    • 5
    Rating: 0/5 (0 votes cast)

    Thank you for rating!

    You have already rated this page, you can only rate it once!

    Your rating has been changed, thanks for rating!

    46
    Tweet
    • More news
      • Ready to control Columbus
        • Columbus delivered to Kennedy Space Center
        • Astrolab Mission
        • Related links
        • Controlling Columbus
        • International Space Station (ISS)
        • German Aerospace Center (DLR)

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • G+
    • Facebook
    • Livestream
    • Subscribe
    • App Store
    • ESA Operations Twitter

    Follow ESA operations

    • LATEST ARTICLES
    • · ESA astronaut Timothy Peake set fo…
    • · Space drives e-mobility
    • · Proba-V opens its eyes
    • · First new Galileo satellite arrive…
    • · Next destination: space
    • FAQ

    • Jobs at ESA

    • Site Map

    • Contacts

    • Terms and conditions