 |  |  |  |  |
| |  | |  | |
 |
Our vision About human spaceflightCurrent missions PromISSeATVMars500 Past missions Multimedia Web Streaming Network (WSN)Multimedia galleryHSF RSS feed Resources Erasmus Experiment Archive (EEA)Mission newspapersPress ReleasesServices CalendarSubscribe
|  |  |  |  | | | Unique three-way partnership for ATV ground control 26 February 2008
 | Three teams, with a total of 30 people, work at ATV-CC at CNES Toulouse facility, in 3 different control rooms separated by glass walls:
- In the centre of the photo, the Flight Control Team, in charge of the ATV operations during the first Joint Integrated Simulation which happened 31 July 2007. The main control room is dedicated to the ATV mission execution/management performed by the CNES flight control team, headed by the flight director.
- The ESA ATV Operations Management Team (OMT), in charge of the overall operations preparation and execution activities, and of decision making for off-nominal and emergencies situations (on the right side)
- The Engineering Support Team, providing flight analysis and expertise for the whole mission. (on the left side)
Credits: ESA |  |  |  |  |
| | | | ATV operations 'true trilateral effort'
 | Alberto Novelli, Head of ATV Mission Operations
Credits: ESA |  |  |  |  |
| |
|  | Space Operations & Situational Awareness ATV Jules Verne Automated Transfer Vehicle (ATV)  Related ESApod ATV Control Centre readies for Europe's first-ever automated dockingRelated articles Crew oxygen for ISS loaded on Jules VerneRussian fuel flows in Jules Verne’s veinsATV operations: training the teamFinal preparations for first human-rated spacecraft to be launched from Europe's SpaceportRelated links International Space StationEurope's Spaceport
|