Test campaign preparation
Once selected teams are announced, students will begin the preparation of the test campaign, including the hardware and software finalization and functional testing, and test documentation writing.
Following a webinar offered by ESA on environmental testing, throughout the opportunity, progress meetings may be organised between ESA and the team to follow up and support the development status and preparatory activities of the test campaign.
Students may elect to use one or more of the following test facilities, for a maximum of 4 weeks (20 working days) in total, including test setup and disassembly:
- 20kN Electrodynamic Shaker
- Thermal Vacuum Chamber (-60degC/+100degC, >=10-6 bar)
- Vacuum Oven (<=+200degC, >=10-5 bar).
Further information on the capabilities of the test equipment can be found in the “Test Opportunities: Facility Handbook and Requirements” document.
With the support from ESA, students will have to prepare the documentation necessary for environmental testing, such as the Test Specification and Test Procedure.
The schedule of the test campaign will be prepared by the team and ultimately accepted by the facility operators at the Campaign Kick-Off meeting.
Once the test documentation is ready, a Campaign Kick-Off meeting will be organised to confirm the readiness to proceed with the scheduled campaign. The team will have to demonstrate that the test item and its Ground Support Equipment has been adequately checked at the university and that the team is fully ready to use the allocated slot at the test facility.