Proba-2’s final electrical configuration is verified and the team is able to continue electrical health monitoring and battery charging of the spacecraft from the undertable room beneath the launch platform.
This activity is followed by a joint dress rehearsal for the launch involving all the personnel concerned: the launcher authorities at Plesetsk, as well as the SMOS and Proba-2 launch teams, as well as ground station teams in Redu, Belgium for Proba-2 and Toulouse, France for SMOS. It kicked off at 23:00 in the Mission Control Centre (MCC).
The simulation follows the Rockot Event Launch Countdown Procedure, with all data streams including voice and video links checked out and verified up to the point of lift-off and tracking of the Rockot until radio-visibility is lost. Following this successful rehearsal, which involves spending the night in the MCC, Thursday is set aside for recuperation.