18 September

27 FEB. 2004 Data di pubblicazione 1383 Visualizzazioni

2003: On 18 September 2003, the last preparations for ESA's SMART-1 spacecraft were made in Europe's Spaceport in Kourou, French Guiana, to make it ready for its launch the following week.

SMART-1's Solar Array protections were removed and the space capsule made ready for flight. It was then enclosed by a 2.6 metre 'raising cylinder' on which was placed the second spacecraft to be launched at the same time, E-Bird. The previous day, 17 September, SMART-1 had been placed on top of its Ariane 5 launcher.


Link correlati


rimani aggiornato

Iscriviti alla nostra newsletter per ricevere le ultime notizie, gli aggiornamenti sulle missioni e approfondimenti esclusivi direttamente nella tua casella di posta. Sii tra i primi a conoscere i nostri prossimi progetti e le nostre scoperte.