An anomaly occurred during the final phase of the synchronized sequence of the Ariane 5 countdown. The countdown procedure was automatically stopped before triggering the ignition sequence of the main stage's Vulcain engine.
The two satellites, HotBird 7 and Stentor, the launch vehicle and all the ground equipment are in a safe mode.
Further information will be given on Friday morning during apress conference held in Kourou at 10:30 a.m. and carried on a multiplex telephone call in Evry (14:30 CET).
Mediemodal
Mediemodal
Centre National d'Etudes Spatiales (CNES)
Ariane 10 tonnes
Ariane 10 tonnes
hold deg oppdatert
Abonner på nyhetsbrevet vårt for å motta de siste nyhetene, oppdateringer om oppdrag og eksklusiv innsikt direkte i innboksen din. Vær blant de første som får vite om våre kommende prosjekter og gjennombrudd.