Following twelve months of successful operation in the ground segment development of the Galileo program, the Galileo System Test Bed Version 1 (GSTB-V1) routine operations were concluded on 22 December 2004.
The GSTB-V1 project supported experimentation on the critical performances behind the services to be delivered to users by the final Galileo system. The results of the GSTB-V1 experimentation will be delivered to the development phase activities necessary for in-orbit validation of the Galileo system.
The GSTB-V1 consisted of a worldwide network of sensor stations collecting high quality GPS observables at 1 Hz, an Experimental Precision Timing Station, located at the Istituto Elettronico Nazionale (IEN) Time Laboratory, providing the reference time scale steered to universal time and international atomic time (UTC/TAI), and a Processing Centre located at the European Space Agency (ESA-ESTEC) in The Netherlands which was used for the generation of navigation and integrity core products based on Galileo-like algorithms.
Mediemodal
Experimental Galileo System Time and steering to UTC/TAI
Orbit Determination and Time Synchronization and Signal In Space Accuracy
Integrity computation
Actual measurements and comparison of alternative algorithms in a realistic environment
Galileo timing infrastructure set-up
Calibration over an extended period of time
Early verification and tuning of simulators and build-up of adequate analysis tools
Contribution to the consolidation of the operational concept
Mediemodal
The next step will be the Galileo System Test Bed Version 2 (GSTB-V2), aiming at the launch of the first experimental satellite by end 2005 that will allow for experimentation on the Signal-In-Space and the Navigation Payload, including on-board clock characterisation.
Galileo is an initiative of the European Commission and the European Space Agency. Galileo will be a global navigation satellite infrastructure under civil control. It will ensure European sovereignty in future traffic management services and many other application areas.
Mediemodal
First prototype of Galileo ground segment
Galileo: contracts for the first satellites
Contract signed for launch of two experimental Galileo satellites
Mediemodal
Relaterade länkar
ESA Navigation Applications Development Facilities
Galileo website (European Commission)
European Satellite Navigation Industries
GSTB-V1 results (.pdf 688 Kb)
håll dig uppdaterad
Prenumerera på vårt nyhetsbrev för att få de senaste nyheterna, uppdateringar om uppdrag och exklusiva insikter direkt i din inkorg. Var bland de första som får veta om våra kommande projekt och genombrott.