2003: On 18 September 2003, the last preparations for ESA's SMART-1 spacecraft were made in Europe's Spaceport in Kourou, French Guiana, to make it ready for its launch the following week.
SMART-1's Solar Array protections were removed and the space capsule made ready for flight. It was then enclosed by a 2.6 metre 'raising cylinder' on which was placed the second spacecraft to be launched at the same time, E-Bird. The previous day, 17 September, SMART-1 had been placed on top of its Ariane 5 launcher.
Medien-Modal
16 September
15 September
14 September
auf dem Laufenden bleiben
Abonnieren Sie unseren Newsletter, um die neuesten Nachrichten, Missionsupdates und exklusiven Einblicke direkt in Ihrem Posteingang zu erhalten. Erfahren Sie als Erste von unseren kommenden Projekten und Durchbrüchen.