STS-134 mission original schedule

31 MÄR. 2011 Veröffentlichungsdatum 1049 Aufrufe

Flight Day 1
- Launch
- General support computer activation
- Shuttle Remote Manipulator System checkout

Flight Day 2
- Thermal protection system inspection
- EVA suits checkout
- Rendezvous preparation

Flight Day 3
- Rendezvous pitch manoeuvre
- Rendezvous and docking to ISS with Orion
Relative Navigation System activation
- Hatch opening, ingress ISS, middeck transfers
- Deployment of Express Logistics Carrier 3

Flight Day 4
- Deploy AMS-02 from Shuttle and berth to
ISS, using both the Space Station Remote
Manipulator System and the Shuttle
Remote Manipulator System
- First Extra Vehicular Activity (EVA-1) preparation

Flight Day 5
- EVA-1 by Feustel and Chamitoff. Each
spacewalk will last about six hours
- Retrieve MISSE 7experiment containers
from ISS and install them in Shuttle Bay
- Remove MISSE 8 experiment container
from Shuttle Bay and install it on ISS
- Fluid line routing

Flight Day 6
- Focused inspection
- Water dump
- EVA-2 preparation

Flight Day 7
- EVA-2 by Feustel and Fincke
- Inspect and lubricate Port Solar Array
Rotary Joint
- Fluid line routing and ammonia fill
- Water dump

Flight Day 8
- Late inspection with Orbiter Boom Sensor
System with Endeavour still docked to the ISS
- Shuttle crew half day off-duty
- EVA-3 preparation

Flight Day 9
- EVA-3 by Feustel and Fincke
- Integrated Boom Assembly stowed on the
truss orbital support equipment
- Swap Electrical Flight and Power & Data
Grapple Fixture
- Perform preparation tasks on spare Special
Purpose Dexterous Manipulator
- Middeck transfers

Flight Day 10
- Added flight day to accommodate work on the U.S. carbon dioxide removal system and other maintenance tasks.

Flight Day 11
- Off duty, crew conference
- Experiment stow, hatch close
- EVA-4 preparation

Flight Day 12
- EVA-4 by Fincke and Chamitoff
- Integrated Boom Assembly stowed on the
truss orbital support equipment
- Undock from ISS
- Fly-around with Orion Relative Navigation
System activation
- Re-rendezvous for Orion Relative
Navigation System Test

Flight Day 13
- Flight Control Systems checkout
- Cabin stow
- Entry preparation

Flight Day 14
- Deorbit preparation
- Entry and landing

Verwandte Links


auf dem Laufenden bleiben

Abonnieren Sie unseren Newsletter, um die neuesten Nachrichten, Missionsupdates und exklusiven Einblicke direkt in Ihrem Posteingang zu erhalten. Erfahren Sie als Erste von unseren kommenden Projekten und Durchbrüchen.