14 VEEBR. 2008 Avaldamiskuupäev 23048 Vaatamised

Full name: Gravity field and steady-state Ocean Circulation Explorer

Launched: 17 March 2009 from the Plesetsk Cosmodrome, Russia

Duration: After 4 years and 8 months orbiting Earth, the mission came to an end on 11 November 2013, far exceeding its 20-month design life

Mission control: European Space Operations Centre (ESOC), Darmstadt, Germany

Data download: Kiruna (Sweden) and Svalbard (Norway) ground stations

Processing & archiving: ESA’s Earth observation centre in Italy (ESRIN) and the distributed High-level Processing Facilities

Number of instruments: 3

Mission cost: €350 million (including launcher and operations)

Orbit: about 260 km altitude, polar, Sun-synchronous

Mass: 1100 kg

Size: 5.3 m long, about 1 m body diameter

Propulsion tank: 40 kg of xenon

Mission objectives
– to determine gravity-field anomalies with an accuracy of 1 mGal (where 1mGal = 10–5 ms–2).
– to determine the geoid with an accuracy of 1-2 cm.
– to achieve the above at a spatial resolution better than 100 km.

Geoid accuracy: 1 - 2 cm vertically with 100 km spatial resolution

Gravitational acceleration at Earth’s surface is about 9.8 m/s², varying from a minimum of 9.788 m/s² at the equator to a maximum of 9.838 m/s² at the poles.

The six accelerometers (three pairs in three orthogonal directions) are some 100 times more sensitive than any previously flown in space.

Industrial Core Team
Thales Alenia Space (Italy) – satellite prime contractor
EADS Astrium GmbH (Germany) – platform contractor
Thales Alenia Space (France) – gradiometer
ONERA (France) accelerometer & system support

The Core Team led a consortium of 41 companies distributed over 13 European countries.


Technical details:

Satellite

Configuration

Minimum cross-section in the direction of motion (1.1 m2)
Approx. 9 m2 solar array aligned in the orbit plane
1050 kg launch mass

Structure

Several carbon fibre, reinforced plastic structural compartments; load-carrying external structure
Structural dynamics: 110 Hz axial, 18 Hz lateral

Thermal control

Passive with heaters
High-thermal-stability gradiometer compartment (10 mK @ 5 mHz)

Electrical power

24-32 Vdc unregulated bus; protected and redundant lines
Fixed Gallium Arsenide (GaAs) cell solar array, 1300 W
Lithium Ion (Li-Ion) battery, 78 Ah, made of 52 strings with 8 cells each

Attitude control

Nadir pointing
Only magnetorquers for attitude control
Wide-field star trackers hybridised with gradiometer angular acceleration measurement
Coarse Sun sensors and magnetometer for acquisition and safe mode
AOCS/DFACS application software run in central computer

Drag control

Ion thrusters commanded in closed loop, based on gradiometer common-mode acceleration measurements

Reaction Control System (RCS)

20 mN Kaufman-type ion thrusters (2x)

Data handling

Packet telemetry
Flexible and reallocatable packet sizes
High-rate (10 Hz) gradiometer-to-computer link via 1553 bus for drag control command synthesis

Telemetry and Command

RF

S-band up- and down-link and ranging
2 hemispherical antennas on solar array edges

Telecommand

4 Kbits/s

Telemetry

Up to 1.2 Mbps


Seotud lingid


püsige kursis

Telli meie uudiskiri, et saada uusimad uudised, missioonide värskendused ja eksklusiivsed ülevaated otse oma postkasti. Ole esimeste seas, kes saab teada meie tulevastest projektidest ja läbimurretest.