2003: On 18 September 2003, the last preparations for ESA's SMART-1 spacecraft were made in Europe's Spaceport in Kourou, French Guiana, to make it ready for its launch the following week.
SMART-1's Solar Array protections were removed and the space capsule made ready for flight. It was then enclosed by a 2.6 metre 'raising cylinder' on which was placed the second spacecraft to be launched at the same time, E-Bird. The previous day, 17 September, SMART-1 had been placed on top of its Ariane 5 launcher.
Meedia modaal
16 September
15 September
14 September
püsige kursis
Telli meie uudiskiri, et saada uusimad uudised, missioonide värskendused ja eksklusiivsed ülevaated otse oma postkasti. Ole esimeste seas, kes saab teada meie tulevastest projektidest ja läbimurretest.