Preparations are well underway for the qualification flight of Europe’s latest launcher, the Ariane 5 ECA, from Europe's Spaceport in French Guiana. The launch window opens on the evening of 12 February at 16:49 (20:49 CET) and will extend until 18:10 (22:10 CET).
a more powerful Vulcain-2 first stage engine developed from the Ariane 5 generic Vulcain 1 engine
a cryogenic upper stage (ESCA) using the tried and tested Ariane 4 HM7B engine that made over 130 successful launches
Since the failure of the first Ariane 5 ECA Flight in December 2002, the Vulcain-2 nozzle extension has been redesigned and tested, and an exhaustive review of the whole launcher has been conducted.
Modal multimediów
Flight 164 will carry three payloads on its journey into space:
an XTAR-EUR telecommunications satellite: to be placed into GTO
Sloshsat-FLEVO, an experimental mini-satellite to investigate the dynamics of fluids in weightlessness, jointly developed by ESA and NIVR, the Dutch Agency for Aerospace Programmes: to be placed into GTO
Maqsat B2 telemetry/video imaging package: to remain mated to the upper stage of the launcher for recording flight data
A successful rehearsal of the entire launch countdown - including final fuelling and countdown but stopping short of ignition - took place on 12 January. This enabled mission team members to validate launch procedures, and test all launcher equipment and ground facilities.
Modal multimediów
Netherlands Agency for Aerospace Programmes
Modal multimediów
Powiązane linki
Ariane 5 ECA
Ariane 5 launch campaigns
Overview of Europe's Spaceport
ESA Technical & Quality Management
bądź na bieżąco
Zapisz się do naszego newslettera, aby otrzymywać najnowsze wiadomości, aktualizacje misji i ekskluzywne materiały bezpośrednio do swojej skrzynki odbiorczej. Dowiedz się jako pierwszy o naszych nadchodzących projektach i przełomach.