• → European Space Agency

      • Space for Europe
      • Space News
      • Space in Images
      • Space in Videos
    • About Us

      • Welcome to ESA
      • DG's News and Views
      • For Member State Delegations
      • Business with ESA
      • ESA Exhibitions
      • ESA Publications
      • Careers at ESA
    • Our Activities

      • Space News
      • Observing the Earth
      • Human Spaceflight
      • Launchers
      • Navigation
      • Space Science
      • Space Engineering
      • Operations
      • Technology
      • Telecommunications & Integrated Applications
    • For Public

    • For Media

    • For Educators

    • For Kids

    • ESA

    • Proba Missions

    • Proba-V at a glance
    • Overview
    • Objectives
    • About the instrument
    • V for Vegetation
    • Serving science
    • Fitting the world in a box
    • About the platform
    • Joining ESA’s Proba family
    • Boxing clever
    • About the mission
    • Made in Belgium
    • On the ground
    • Starting operations
    • New technology
    • Hitching a ride
    • Tracking aircraft from orbit
    • New space semiconductor
    • Detecting radiation
    • Fly by fibre
    • About the launch
    • Launcher
    • Launch site
    • Proba-V launch diary part 1
    • Proba-V launch diary part 2
    • Proba-V launch diary part 3
    • Proba-V launch diary part 4
    • What's next
    • Proba-3
    • Already flying
    • Proba-1
    • Proba-2
    • Multimedia
    • Proba-V images
    • Proba images
    • Proba Earth images
    • Videos
    • Animations
    • Contact
    • Contact us

    ESA > Our Activities > Technology > Proba Missions

    Entry 20: Rail ride to the launch pad

    SMOS, Proba-2 and Khrunichev teams

    Friday 23 October to Tuesday 27 October - The weekend sees the launcher authorities finalise electrical checkouts of the combined Proba-2, SMOS and Breeze-KM upper stage – collectively known as the space head - in the MIK 101b cleanroom and the General Hall. As this goes on the electrical health of Proba-2 is monitored on a near continuous basis and on Saturday the spacecraft's flight battery is fully charged.

    On Monday morning, a joint photo is taken of the combined Proba-2, SMOS and Krunichev teams in front of the space head. After this preparations for the launch pad roll-out of the space head begin: a thermal blanket is applied to the space head after which it is lifted onto a dedicated rail car.

    Following this operation the team has the chance to fully charge the Proba-2 flight battery once again, prior to its journey to the launch pad. This is the Proba-2's last task in the context of launch preparations at the Plesetsk MIK. From here on in, activities are continuing in the undertable room of the Rockot launch pad.

    Space head transport to the launch pad

    The roll-out of the space head from the MIK to launch pad takes place on Tuesday mornng. The rail car sets off at 6:00, and arrives on the launch pad around 10:00. After arrival, the launcher authorities immediate prepare for the lifting and mating of the Space Head on top of the Rockot's second stage.

    In the meantime the Proba-2 team transports its electrical ground segment equipment to the undertable room. This very small room underneath the launch pad is where the team will be reconnecting their electrical ground support equipment (EGSE) to the Proba-2 spacecraft via umbilical links on Wednesday evening.

    In parallel to all these activities several meetings are devoted to preparing for a joint dress rehearsal due to take place during Wednesday and Thursday.

    Last update: 27 October 2009

    Rate this

    Views

    Share

    • Currently 0 out of 5 Stars.
    • 1
    • 2
    • 3
    • 4
    • 5
    Rating: 0/5 (0 votes cast)

    Thank you for rating!

    You have already rated this page, you can only rate it once!

    Your rating has been changed, thanks for rating!

    10
    Tweet
    • Proba-2 launch diary
      • Entry 1: Belgium says goodbye to Proba-2
        • Entry 2: Proba-2's journey to Plesetsk
          • Entry 3: Unpacking after the trip
            • Entry 4: Proba-2 unloaded and ready for inspection
              • Entry 5: Proba-2 powered up
                • Entry 6: End-to-end testing
                  • Entry 7: Filling Proba-2 up with xenon
                    • Entry 8: Proba-2 gains a solar panel
                      • Entry 9: Proba-2 gains its second ‘wing’
                        • Entry 10: Completing Proba-2
                          • Entry 11: Putting Proba-2 to the test
                            • Entry 12: Checking launch tower links
                              • Entry 13: Letting SMOS take its turn
                                • Entry 14: Second phase of Proba-2 launch campaign begins
                                  • Entry 15: Last bolts tightened on Proba-2
                                    • Entry 16: A short journey off the ground – Proba-2 mated to its adapter
                                      • Entry 17: Proba-2 mated onto Breeze upper stage
                                        • Entry 18: Encapsulated, Proba-2 vanishes from view forever
                                          • Entry 19: Proba-2 in place and powered up
                                            • Entry 20: Rail ride to the launch pad
                                              • Entry 21: Far-flung dress rehearsal for launch

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • G+
    • Facebook
    • Livestream
    • Subscribe
    • App Store
    • LATEST ARTICLES
    • · Rare merger reveals secrets of gal…
    • · Watching for hazards: ESA opens as…
    • · ESA astronaut Timothy Peake set fo…
    • · Space drives e-mobility
    • · Proba-V opens its eyes
    • FAQ

    • Jobs at ESA

    • Site Map

    • Contacts

    • Terms and conditions