Friday 11th September – Today sees another major step in Proba-2’s preparation for flight: final mechanical integration is officially completed – everything that should be attached to the spacecraft has been attached.

It has taken a lot of delicate work to get this far, and the team’s relief is tangible. The spacecraft is now complete in its flight configuration - except for a last panel, to be integrated at the last moment, for further testing and late access to the flight battery. The ESP, an experiment to concentrate sunlight on a solar panel and one of 17 technology experiments being flown, has also been made ready for flight.

Inside view of spacecraft with battery mounted, prior to closure
Inside view of spacecraft with battery mounted, prior to closure

In parallel work continues in the EGSE (Electrical Ground Support Equipment) room, preparing for tomorrow’s fully functional test of the spacecraft. All the various tasks necessary for success are being reviewed. In addition further LEOP (Launch and Early Operations Phase) activities are being practiced using the satellite simulator integrated with the ground segment software.

Today’s warm and sunny weather even inspires a rare exodus beyond the MIK large integration building where the team spends all its long working hours – they have an impromptu picnic on the surrounding grass.

Related Links

Proba-2, final checks
Enabling & Support

Entry 1: Belgium says goodbye to Proba-2

269 views 0 likes
Open item
Loading of Proba-2 container in cargo plane at Brussels airport
Enabling & Support

Entry 2: Proba-2's journey to Plesetsk

256 views 0 likes
Open item
Transport of Proba-2 container to the MIK
Enabling & Support

Entry 3: Unpacking after the trip

196 views 0 likes
Open item
Opening of the Proba-2 satellite container in the cleanroom
Enabling & Support

Entry 4: Proba-2 unloaded and ready for inspection

213 views 0 likes
Open item
Hoisting of satellite from its container and assembly of integration dolly
Enabling & Support

Entry 5: Proba-2 powered up

266 views 0 likes
Open item
Inspection of Proba-2 internal compartments
Enabling & Support

Entry 6: End-to-end testing

277 views 0 likes
Open item
Filling of the propulsion tank with xeon
Enabling & Support

Entry 7: Filling Proba-2 up with xenon

252 views 0 likes
Open item
Mounting of the first deployable solar panel
Enabling & Support

Entry 8: Proba-2 gains a solar panel

321 views 0 likes
Open item
Mounting of solar panel
Enabling & Support

Entry 9: Proba-2 gains its second ‘wing’

217 views 0 likes
Open item
Proba-2 with solar panels mounted
Enabling & Support

Entry 10: Completing Proba-2

217 views 0 likes
Open item
Proba-2 final full functional test
Enabling & Support

Entry 11: Putting Proba-2 to the test

236 views 0 likes
Open item
Proba-2 launch team group picture at the museum
Enabling & Support

Entry 12: Checking launch tower links

217 views 0 likes
Open item
Proba-2 back in its storage container in the cleanroom
Enabling & Support

Entry 13: Letting SMOS take its turn

211 views 0 likes
Open item
Proba-2 team arrival at Plesetsk Cosmodrome
Enabling & Support

Entry 14: Second phase of Proba-2 launch campaign begins

238 views 0 likes
Open item
ESP mounting on the final panel
Enabling & Support

Entry 15: Last bolts tightened on Proba-2

243 views 0 likes
Open item
Proba-2
Enabling & Support

Entry 16: A short journey off the ground – Proba-2 mated to…

223 views 0 likes
Open item
Proba-2 in its final launch position, on top of Breeze
Enabling & Support

Entry 17: Proba-2 mated onto Breeze upper stage

290 views 0 likes
Open item
Removal of Proba-2 protective covers
Enabling & Support

Entry 18: Encapsulated, Proba-2 vanishes from view forever

218 views 0 likes
Open item
Encapsulation
Enabling & Support

Entry 19: Proba-2 in place and powered up

223 views 0 likes
Open item
SMOS, Proba-2 and Khrunichev teams
Enabling & Support

Entry 20: Rail ride to the launch pad

243 views 0 likes
Open item
Joined dress rehearsal of Proba-2 and SMOS in MCC
Enabling & Support

Entry 21: Far-flung dress rehearsal for launch

465 views 0 likes
Open item